Laserfiche WebLink
FEB 2 5 20116 <br />- -ii ­­­ __ ­_ - - R Ti <br />- -_ - - r­WI1--AT— -SU N - , v I � <br />I mot,- I -IUE7_T'W6, U R, I S ITEM E I Ae I A L <br />'N <br />—P—= D I _N _T D D DTC" D HZ�ITP",IPMTM�:Nj <br />EQECTftICALfitO'-P-AHEL <br />breakers/Switches -Ensure switches are in the properposition, are not tripped and there are no obvious signs <br />of tampering or damage <br />Decals and Tags - Ensure all breakerstswitches are property and clearly identified <br />indicator Lights - Ensure all lights are working correctly and are clearly Identified <br />----------- <br />AUTOMAMONS �STEjA <br />L / Server Cabinet - Ensure them am no red warning Indicators on the front of the servers status panel or the Direct <br />Ll Connect satellite box <br />PLC Cabinet -Ensum them are no red oryellowhidicators on the front ofthe PLC <br />OV6 Graphics - Ensure them are no red alarms in the Alarm Bar located on the bottom Of the UCOS Runtime <br />graphics <br />Door Locks - Ensure doors am locked and there are no signs of unauthorized entry <br />Enunciator Lights/Panel - Ensure correct lights are onobfi. Press 'test* button, If equipped, to make sure all <br />lights work correctly <br />7. <br />iWater Leaks - Look for signs of water leaking into MCC <br />I _JHVAC -Ensure the heating and cooling system is working properly <br />Labeling - Ensure all equipment, switches and breakers are labeled properly for clear id <br />VMCOVIPRESSElm <br />]Water Drains - Open to remove any water and then close <br />113alts - Ensure the bells are not too fight or W loose Look forsigns ofwear <br />L/ <br />Gauges - Ensure they work correctly, Ensure compressor comes on/off at correct setpoints <br />V <br />�7 <br />Oil Levels -Check oiler or sight Vass for level and condition of &/ <br />Abnormal No Ise - Listen for squealing belts, grinding bearings and other noises that aranI normal and could be <br />a sign of Impending failure <br />Vibration - Looklisten for excessive vibrations that indicate Impending failure <br />On-off Switch - Ensure switch operates correctly <br />A I r Le ak - Listen for leeks <br />Valves - Ensure 0 valves am in their correct operzd��rg position <br />00 aviler-fiep-st- (OWN <br />j DAILY- V;sually inspect to ensure there are no vapor or liquidleaks <br />S C <br />STAGE1 Check for product and vapor leaks. Inspect liquid level to prevent overltowing. Make <br />sure pump vvorks correctly and there are no signs of contamination <br />s e <br />WASTE <br />A <br />STAGEA <br />STAGE 2 Check !or product and vapor teaks. Inspect liquid level to prevent overflowing. Make <br />sure <br />sure pump works correctly and them am no signs ofcontsminabon. <br />C <br />STAGE TA G <br />T y <br />AGE 3 Check for product and vapor leaks. Inspect liquid level to prevent overflowing. Make <br />sure pump works correctly and there are no signs of contamination. <br />re I <br />AReA1 do am raw ft din A on. i_4 0"&" oecm& R- Haat <br />A6 <br />P <br />US <br />DrumsH many drums are or. si!e? Check for spills, leaks and signs of damage. Ensure drums are stored <br />"ith"i ma c <br />M. in guidelines and are dated: arrange to have drums removed that ale approaching theirstorage deadline <br />'n an <br />Drum Labeting - Ensure all drums are labeled property within guidelines, with accumulation start date, and that <br />date is less than 90 days old; ensure drum lid Is secured <br />Housekeeping -Leaks or spills, keep clean and orderly, ensure only appropriately labeled waste Is stored there <br />