Laserfiche WebLink
FEB 2 5 20116 <br />HON <br />TUEc WED <br />0 14-1,11ii D <br />I— <br />THUR FFU _J SAT SUN <br />REMD <br />=1)o —EFF7,W7 D 0 <br />ELIECTRIC614 CONTfi5L I?AXEL ENWR <br />Filill <br />1� <br />k4 <br />Breakers,'Switchas - Ensry sirtchas are in the properpcsition�;- 11.1 tripped " — T <br />IF, d ;;; a4 Z 78b <br />of tampering or damage <br />Decals and Tags -Ensure all breakers/switches are property and clearly Identified <br />Indicator Lights - Ensure all lights are work.,ng correctly and ate clearly identified <br />ALqVPAATVN SYSTFJYt <br />Server Cabinet -Ensure them are no red warning indicators on the front of the servers status panel or the Direct <br />Connect set -Wife box <br />PLC Cabinet - Ensure them are no red or yeflow indicators an the front ofthe PLC <br />OWS Graphics -Ensure there are no red alarms in the Alarm Bar located on the bottom of the UCOS Runtime <br />_j <br />Door Locks - Ensure doors are locked and them ate no signs of unauthorized entry <br />Enunciator LightsManel -Ensure coned lights are oniblif Press*19srbuttan, ifequipped, tomake Sure all <br />lights work correctly <br />Water Leaks - Look for signs of water leaking Into MCC <br />F HVAC Ensure the heating and cooling system Is working property <br />sure all equipment, sksitches and breakers are labeled property for clear identification <br />J. <br />PARR;) <br />ti <br />t1w N/ <br />Water Drains - Open to remove any water and then close <br />Belts - Ensure the belts are not too fight or too loose Look for signs of wear <br />Gauges - Ensure they work correctly, Ensure compressor comes ofVoff of correct setpoints <br />Oil Levels -Check oiler or s,r,ht glass forlevel and condition ofoil <br />Abnormal Noise - Listen for squealing belts, grinding beatings end other noises that aren't normal and could be <br />a sign of impending failure. <br />W <br />Vibration - Look4isten forexcessive vibrations that Indicate impending failure <br />On-offSwitch _-_Ensure switch operates correctly <br />Air Leak - Listen for leaks <br />-_VAIVe$ - Ensure all valves are In their correct operating position <br />Vista o;:Arator(om) <br />V' <br />DAILY- Visually inspect to ensure there are no vapor or liquid leaks <br />STAGE I Check for product and vapor leaks Inspect liquid level to prevent overflowing Mahe <br />sure pump works correctly and there are no signs of contamination. <br />STAGE 2 Check for product and vapor leaks Inspect liquid level to prevent overflowing Make <br />sure pump works conedly and there are no signs of contamination. <br />STAGE 3 Check forproduct and vapor leaks Inspect liquid level to prevent overflowing Make <br />sure pump works correctly and there are no signs of contamination <br />HAZAROOLW <br />ON -UAzA <br />RD0USW0 <br />TF jM11AEk <br />finclitips D&Ai4e•iA"r.1w*1 Refer.to SQF=4D4 <br />Drums - Now many drums are or site? Check for spills, leaks and signs of damage Ensure Crum$ are stored <br />Min guidefines and are dated, arrange to have drums removed that are approaching their storage deadline <br />V <br />Drum Labeling - Ensure all drums are labeled property within guidelines, with accumulation start date and that <br />date Is less than 90 days old; ensure drum fid is secured <br />Housekeeping - Leaks orspills, keep clean and orderly, ensure only appropriately labeled waste Is stored them <br />Santa TerminY Last Up4ated,04/11/13 <br />