Laserfiche WebLink
�� <br />Weekly Review: <br />SantaTerminal Last updatet 04/11/13 <br />VAPOR RECOVERY UNIT (VRU) /VAPOR COMBUSTION UNIT (VCU) <br />MON TUE WED <br />THUR FRI SAT SUN ftern ENVIRONMENTAL <br />VRU - Visuallyinspect for leaks, excessive or unusual noises; take daily readings, check level in vapor <br />knockout tank <br />INLET VAPOR PRESSURE <br />Carbon Bed Tempratures/ Vessel #1 Botton <br />qn <br />Carbon Bed Temperaturesl Vessel #2 Top <br />Carbon Bed Temperatures/ Vessel #2 Bottom <br />Gasoline Temperature (Absorbent) <br />TI -701 (absorbent supply) <br />TI -303 (absorbent from exch.) <br />Vacuum pump seal -fluid, temperatures and flow <br />C-1 GPM <br />C-2 GPM <br />TI -401 Inlet <br />TI-402Discha e#1 <br />T1403 Discharge #2 <br />Seal fluid level (place check mark if near center of site glass) <br />Gasoline level (place check mark If near center of site glass) <br />Gasoline circulation pressures <br />PI -301 Top absorber nozzle <br />PI -302 Lower absorber Nozzle <br />PI -701 P-1 DischaERe <br />PI -601 P-2 Discharge <br />PI -501 Vacuum control trip point <br />Record CEM instant reading <br />q 0 <br />Record CEM rolling PPM reading <br />CEM data unit working property? <br />�j 0 <br />Any evidence of carbon dust from absorber vent? <br />Ajo <br />Any visible vapor at absorber vent? <br />'& 112 <br />Any visible vapor at PN valve? <br />() <br />Any unusual noise or vibrations? <br />I Span Gas (Propane) <br />Monday <br />r <br />Tuesday <br />Wednesday <br />r\ <br />Thursday <br />Friday <br />Saturday <br />Sunday <br />TumoverAce"Ald 86n <br />Weekly Review: <br />SantaTerminal Last updatet 04/11/13 <br />