Laserfiche WebLink
CHEVRON <br />BANTA, CA <br />TANK #137 <br />Post -Repair Inspection of 05/28/13 <br />Page 4 of 152 <br />1. Replace seals around fixed roof column and gauge well. <br />a. The seal around the fixed roof column has been removed and not replaced at time <br />of inspection. <br />2. Loosen the "U" bolts that are present to allow movement. <br />a. The "U" bolts were loosened prior to the coating to be installed. <br />3. Install an epoxy coating on the bottom. <br />a. An epoxy coating was installed and holiday tested. Spot repairs were made and <br />retested. The coating is in satisfactory conditions. <br />Note: Seal is scheduled to be installed on May 31, 2013 by Matrix. <br />