Laserfiche WebLink
MUN <br />T�UE__VJED <br />THUR <br />FRI <br />SAT SUN ITEM <br />P, 41 <br />.- <br />J�D N <br />D �N <br />!�N <br />1) W D �N, <br />Breakers/SvritChes - 'in the proper position, are not tripped and there are no obvious signs <br />Ensure switches are <br />V <br />of tampering or damage <br />witches are property and clearly identified <br />Decals and Tags - Ensure all breakers/switches <br />Indicator Lights - Ensure 811 lights are working correctly and are clearly identified <br />a <br />Server Cabinet - Ensure there are no red warning indicators on the front of the servers status panel or the Direct <br />V/ <br />Connect satellite box <br />PLC Cabinet -Ensure there are no red or yellow indicators on the front of the PLC <br />OWS Graphics -Ensure there are no red alarms in the Alarm Barlocated on the bottom of the UCOS Runtime <br />graphics <br />kiRM <br />L,_ NTE" <br />Door Locks - Ensure doors are locked and there are no signs of unauthorized entry. <br />FT7_ <br />Enunciator Lights/Panel - Ensure correct lights are on/off.Press `test" button, if equipped, to make sure all <br />V/ <br />lights work correctly. <br />I/ <br />I/ <br />Water Leaks -Look for signs of water leaking into MCC <br />_HVAC <br />V <br />V <br />- Ensure the healing and cooling system is working properly <br />Labeling Ensure all equipment, switches and breakers are labeled property For clear Identification <br />Water Drains -Open to remove any water and then <br />Belts - Ensure the belts are not too light Of too 100s a. Look for signs of wear <br />j/ <br />Gauges -Ensure they work correctly, Ensure compressor comes on/off at correct selpoints, <br />Oil Levels -Check oiler or sight glass for level and condition of oil <br />Abnormal Noise -Listen forsquealing belts, grinding bearings and other noises that aren't normal and could be <br />a sign ofimpending failure. <br />Vibration -Lookilisten for excessive vibrations that indicate impending Failure <br />✓ <br />'z <br />On-off Switch - Ensure switch operates correctly <br />V7 <br />Air Leak - Listen forleaks <br />Valves Ensure all valves are in their correct operating position <br />DAILY- Visually inspect to ensure there are no vapor orliquid leaks <br />ARE <br />STAGE 1 Check forproduct and vaporleaks. Inspect liquid level to prevent overflowing. Make <br />sure pump works correctly and there ere no signs of contamination. <br />STAGE 2 Check for product and vaporleaks. Inspect liquid level to prevent overflowing. Make <br />sure pump works correctly and there are no signs of contamination. <br />STAGE 3 Check for product and vaporleaks. Inspect liquid level to prevent overflowing. Make <br />sun- pump works correctly and there are no signs of contamination. <br />4 <br />Drums -How any drums are on site? Check for spills, leaks and signs of damage. Ensure drums are stored <br />guidelines and are dated, arrange to have drums removed that are approaching their storage deadline. <br />Drum Labeling -Ensure all drums are labeled properly within guidelines; with accumulation start date, and that <br />date is less than 90 days old, ensure drum lid is secured <br />Housekeeping - Leaks orspdts; keep clean and orderly, ensure only appropriately labeled waste is stored there <br />V, <br />MAY '_,; 6 2017' <br />ENVIRONMENTAL HEALTH <br />DE P/1, R T I VIE_ N T <br />Last Updated: 04111/13 <br />3,,w T-­il.l <br />