My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY kL 6 2017 <br />ENVIRONMENTAL HEALTH <br />D E Pj',1 R T1,,,:2T <br />Banta Terminal Last Updated: 04/12/13 <br />7"- <br />NIT fVRU) f,VAPOR COMBUSTION UNIT (VCU) <br />MON TUE <br />IN <br />WED THUR <br />D IN D N <br />FRI SAT <br />D I N D N <br />OR <br />SUN N'KAMAL <br />Q FL Ti G I <br />D <br />u <br />tank <br />Item <br />Dr knockout <br />wrp 1WAi <br />LESS THAN 18 <br />INLET VAPOR PRESSURE <br />ICarbon <br />Bed Temperatures/ Vessel #1 Top <br />Carbon Bed Tempratures/ Vessel #1 Botton <br />Carbon Bed Temperatures/ Vessel #2 Top <br />Carbon Bed Tem eratures/ Vessel #2 Bottom <br />Gasoline Temperature (Absorbent) <br />�i 1 "fir- D roM <br />L, <br />1i90 <br />MAX <br />700E MAX <br />TI -701 (absorbent supply) <br />TI -303 (absorbent from exch.) <br />I Off <br />Vacuum pump seal fluid, term peratures and flow <br />C-1 GPM_ <br />b, <br />report <br />C-2 GPM <br />105F MAX <br />TI -401 Inlet <br />135F MAX <br />TI -402 Discharge #1 <br />135F MAX <br />TI -403 Discharge #2 <br />report or check <br />Seal fluid level (place check mark if near center of site glass) <br />report or check <br />Gasoline level (place check mark if near center of site glass) <br />MGasoline <br />16 PSIG MAX <br />circulation pressures <br />PI301 To absorber nozzle <br />17 PSIG MAX <br />PI -302 Lower absorber Nozzle <br />I 'A <br />20-60 PSIG <br />PI -701 P-1 Discharge <br />I _1.1 <br />q-7 <br />Y11 <br />,(7 <br />20-60 PSIG <br />PI -601 P-2 Discharge <br />28" HG <br />PI -501 Vacuum control trip point <br />41A I <br />Record CEM instant reading <br />Record CEM rolling PPM reading <br />CEM data unit working properly? <br />L) <br />An evidence of carbon dust from absorber vent? <br />N, <br />An visible vapor at absorber vent? <br />A) <br />ti <br />t " <br />Any visible vapor at P/V valve? <br />Any fluid leaks? <br />bz_ t,_U <br />J'L <br />Any unusual noise or vibrations? <br />Gas (Nitrogen) <br />S Gas (Propane) <br />Day <br />DayOperator.Signature Ni ht Shift Operator Signature <br />Monday <br />Tuesday <br />Wednesday <br />Thursday <br />Friday <br />Saturday <br />-Sunday <br />Tili7i6vi6rrComments lnbp,anyincomi3letL tasks orc6rrecti)% <br />TumoverAccepted 4M,, <br />MAY kL 6 2017 <br />ENVIRONMENTAL HEALTH <br />D E Pj',1 R T1,,,:2T <br />Banta Terminal Last Updated: 04/12/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.