My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MON. .j <br />TVEz: ,.j WED ': FRI <br />SAT <br />ITEM <br />D <br />D 1,A*A D <br />Leaks - Check all pumps for dnps, leaks or dama e <br />Vibration - Listen for vibrations that could be a sign of impending failure (ex: broken mounts, incorrect alignment) <br />Abnormal Noise - Listen for abnormal noises that could be a sign of impending failure (bearings grinding, pump <br />1 3 <br />sounds like rocks are in it) <br />OR <br />Lubrication -Check oiler or sight glass for proper oil level. Ensure oil is clear, not extremely dirty or foamy <br />Pump/Motor Coupler - Visually inspect the Coupler for signs of damage. Look for'shavings" that would indicate <br />impending failure. Ensure safeguard Is in place to prevent entanglement in rotating shaft. <br />Off/On Switches - Ensure each switch is in the correct position, locked if required and clearly marked as to what <br />it operates. <br />Valve Position Ensure valves are in the correct position, looked and/or sealed as required and clearly marked <br />with a tag with its p&ID # or its purpose. <br />Containment Area Ensure area is clear of leaves and debris; inspect for signs ofdamage <br />Line Shock/Pipe, Vibration -Watch and listen for vibration, which could be a sign of incorrectly sized piping, <br />pumps, pressure relief valves, etc. <br />Pressure Relief Valves -Ensure valves are marked clearly with P&ID # and/or what it operates. Look for drips, <br />leaks and sign of damage. <br />AIM <br />Tags lDecals - Ensure alf pumps are marked with thejrP&lD a tag describing their function or some means of <br />identification. <br />Pressure Gauges - Record pressure gauges when gauges are present Ensure the gauge Is within operating <br />guidelines for your system. <br />lllia�ja <br />Ethanol F-251 report differential pressure and operating pressure once a day <br />Supreme F-251 report differential pressure and operating pressure once per day <br />Reg Unleaded F -11A report differential pressure and operating pressure <br />Reg Unleaded F-18 report differential pressure once per day <br />Diesel F-20 report differential pressure and operating pressure <br />Diesel F-21 report differential pressure and operating pressure <br />Leaks - Look for leaks near seams, welds, fittings and valves. <br />containment Area Ensure area is clear of leaves and debris, inspect for signs of damage <br />Position -Ensure valves are in the cofrectposition and locked or sealed when required. Ensure all <br />points are plugged. <br />Pressure Differential Gauges -Record gauge (M41LE LOADING IS TAKJNG PLACE ON ALL RfSERS FOR <br />THAT PRODUCT) on appropriate form Make sure gauge is not damaged and is working correctly. <br />Pressure Relief Valve -Look for drips, leaks and Signs o/damage. <br />Locks - Ensure air seals and locks are in place and show no signs of tampering. <br />Tags I Decals - Ensure all filter vessels are marked with their P&D #, a tag describing their function or some <br />means of identification. (Refer to API 1637 for Marking/Labeling) <br />StileslPlafform - Ensure stiles and platform are sturdy, no signs of rust <br />Valve Position -Ensure valves are in the correct position (open/closed) and locked ifrequired <br />Drain Intake -Ensure drain is clear of debris that could inhibit flow or cause clogging <br />MAY d ( <br />ENWRONIV17-7.i TAL HEALTH <br />C r_: — T f't� T <br />Last Updated: 04/11/13 <br />Banta Terminal <br />
The URL can be used to link to this page
Your browser does not support the video tag.