Laserfiche WebLink
EN` R0N1VF",4`_._AL H2-ALTH <br />Cr7'_ <br />Last Updated: 04/11/13 <br />Banta Terminal <br />D <br />D D D D <br />D <br />Breakers/Switches - Ensure switches are in the proper position, are not tripped and there are no obvious signs <br />of tempering or damage <br />Decals and Tags - Ensure all breakers/switches are properly and clearly identified <br />Ensure all lights are working correctly and are clearly identified <br />Server Cabinet - Ensure there are no red warning indicators on the front of the servers status panel or the Direct <br />Connect satellite box <br />PLC Cabinet - Ensure there are no red or yellow indicators on Me hoot of the PLC <br />OWS Graphics - Ensure there are no red alarms in the Alarm Barlocated on the bottom ofthe UCOS Runtime <br />graphics <br />Door Locks - Ensure doors are locked and there are no signs ofunauthorized entry. <br />Enunciator Lights/Panel - Ensure correct lights are onloff. Press 'tesr button, if equipped, to make sure all <br />lights work correctly. <br />Water Leaks - Look for signs of water leaking into MCC <br />HVAC - Ensure the heating and cooling system is working properly <br />ti <br />Labeling - Ensure all equipment, switches and breakers are labeled property for clearidentifcaor <br />Water Drains - Open to remove any water and then dose <br />Belts - Ensure the belts are not too fight or too loose. Look for signs of wear <br />21, <br />Gauges -Ensure they work correctly,- Ensure Compressor comes onloff at correct setpoints <br />, <br />Off Levels - Check oiler or sight glass for level and condition of oil <br />Abnormal Noise - Listen for squealing belts, grinding bearings and other noises that aren't normal and could be <br />a sign of impending failure. <br />Vibration - Look4isten for excessive vibrations that indicate impending failure <br />On-off Switch - Ensure switch operates correctly <br />LL <br />Air Leak - Listen forleaks <br />Valves - Ensure all valves are in Moir correct operating position <br />. <br />DAILY- Visually inspect to ensure there are no vapor or liquid leaks <br />- ;_�4j <br />STAGE I Check for product and vapor leaks. inspect liquid level to prevent overflowing. Make <br />sure pump works correctly and there are no signs of contamination. <br />STAGE 2 Check for product and vapor leaks. Inspect liquid level to prevent overflowing Make <br />correctly and there are no signs of contamination. <br />duct and vapor leaks. Inspect liquid level to prevent overflowing- Make <br />correctly and there are no signs ofcontaminatiom <br />Drums -How many drums are on site? Check for spills, leaks and signs of damage Ensure drums are stored <br />deadline <br />within guidelines and are dated, arrange to have drums removed that are approaching their storage <br />Drum Labeling - Ensure all drums are labeled proPelfY within guidetinas with accumulation start date, and that <br />date is less than 90 days old; ensure drum lid is secured <br />Housekeeping - Leaks orspills; keep clean and orderly, ensure only appropriately labeled waste is stored there <br />EN` R0N1VF",4`_._AL H2-ALTH <br />Cr7'_ <br />Last Updated: 04/11/13 <br />Banta Terminal <br />