Laserfiche WebLink
Weekly Review: Date: <br />Terminal Manager Signature <br />L L7 <br />MAY 6 2017 <br />ENVI{ IONIV77 SAL HZALTH <br />CLE—j-,c"i i�,'NT <br />Banta Terminal Last Updated: 04/11/19 <br />90 MAX <br />TI -701 absorbent supI ) <br />10OF MAX <br />TI -303 (absorbent from exch.) <br />ie- <br />reportC-1 <br />Vacuum um seal fluid temperatures and flow <br />GPM <br />report <br />C-2 GPM <br />105F MAX <br />TI -401 Inlet <br />135E MAX <br />TI -402 Discharge #1 <br />135F MAX <br />TI -403 Discharge #2 <br />/ <br />report or check <br />Seal fluid level lace check mark if near center of site lass <br />report or check <br />Gasoline level lace check mark if near center of site lass <br />1i <br />16 PSIG MAX <br />Gasoline circulation pressures <br />PI -301 Top absorber nozzle <br />$s <br />17 PSIG MAX <br />PI -302 Lower absorber Nozzle <br />20-60 PSIG <br />20.60 PSIG <br />PI -701 P-1 Discharge <br />PI -601 P-2 Discharge <br />r <br />28" FIG <br />PI -501 Vacuum control trip point <br />Record CEM instant reading <br />Record CEM rolling PPM reading <br />✓ <br />CEM data unit working ro erl ? <br />Any evidence of carbon dust from absorber vent? <br />0 <br />An visible vapor at absorber vent? <br />MO <br />Any visible vapor at PN valve? <br />1% <br />Any fluid leaks? <br />Any unusual noise or vibrations? <br />Gas (Nitrogen) <br />San Gas (Propane) <br />Day <br />Day Shift Operator Signature <br />Night Shift Operator Signature <br />Monday <br />Tuesday <br />Wednesday <br />Thursday <br />Friday <br />Saturday <br />Sunday <br />Turnover Comments (note any incomplete tasks or corrective actions for next crew to finish): <br />Turnover Accepted By: <br />Weekly Review: Date: <br />Terminal Manager Signature <br />L L7 <br />MAY 6 2017 <br />ENVI{ IONIV77 SAL HZALTH <br />CLE—j-,c"i i�,'NT <br />Banta Terminal Last Updated: 04/11/19 <br />