My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5151
>
2800 - Aboveground Petroleum Storage Program
>
PR0516609
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 10:49:31 AM
Creation date
10/10/2018 4:18:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516609
PE
2831
FACILITY_ID
FA0002836
FACILITY_NAME
SAN JOAQUIN DELTA COLLEGE DIST
STREET_NUMBER
5151
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
01
SITE_LOCATION
5151 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 1 <br />1141 Sibley Street, Folsom, California 95630 <br />(916) 353-2360 • Fax (916) 353-2375 • (800) NES -ADVISE <br />a www.nesgiobal.net <br />March 30, 2011 <br />Mr. Michael Montanus Sent Via: U.S. Mail & email: mtmpchem@aol.com <br />Premier Chemical <br />1652 West Texas Street, Suite 248 <br />Fairfield, CA 94533 <br />Subject: San Joaquin Delta College SPCC Plan <br />5151 Pacific Avenue <br />Stockton, California 95207 <br />Dear Mr. Montanus: <br />As requested, a preliminary recertification evaluation of the Spill Prevention Control & <br />Countermeasures Plan (SPCC Plan) for the San Joaquin Delta College was completed on March <br />22, 2011. During the preliminary recertification evaluation the existing SPCC Plan dated <br />February 3, 2011, was briefly reviewed and a familiarization tour of the above ground storage <br />tank systems was conducted. During the preliminary evaluation there were SPCC Plan revisions, <br />deficiencies noted that require correction before the plan can be certified by a licensed <br />professional engineer. <br />We respectfully request at least 30 business days to revise and prepare the plan in accordance <br />with good engineering practices including consideration of applicable industry standards. It is <br />important that the deadline for submitting the SPCC Plan for San Joaquin Delta College be <br />extended to May 12, 2011 so the certified plan can be developed and implemented in accordance <br />with 40 CFR part 112. <br />Please contact me at 'b� ollgnesglobal.net, or my cell phone (916) 214-3514, if you have <br />questions regarding this request. <br />Thank you, <br />John H. Boll, REA, CPEA <br />Vice President, Consulting Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.