Laserfiche WebLink
Ms. Salli-Anne Newhard PR#10648 <br /> March 30, 2010 Page 2 <br /> CWE will submit one (1) draft hard copy for your review and approval and make any necessary revisions <br /> and submit two (2) final hard copies for your use. <br /> PROJECT SCHEDULE <br /> Our services will be scheduled upon receipt of your written authorization. Verbal information can be <br /> presented to you during the course of our SPCC Plan preparation. CWE will provide you with a list of <br /> items that will be required as part of the SPCC Plan preparation. The SPCC Plan will be prepared in <br /> approximately four (4) weeks from receiving your approval to start work and receiving all the information <br /> to complete the SPCC Plan. <br /> ESTIMATED FEES AND CONDITIONS <br /> Our services will be performed in accordance with this proposal. Our estimated fee to prepare this SPCC <br /> Plan as described in the scope of services above is $2,615. <br /> This cost does not include: meetings and submittals to the local CUPA or any other agency; review or <br /> approval fees; and other items not listed in the above Scope of Services. Any additional consultation <br /> would be performed on a"time and materials"basis. <br /> Thank you for the opportunity to submit this proposal and for taking the time to review our submittal. <br /> We look forward to working with you. If this proposal and cost estimate is acceptable please send us a <br /> written notice to proceed. If you have any questions or require additional information, please contact me <br /> at (714) 385-2602 or jpereira@cwecorp.com. <br /> Respectfully submitted, <br /> CALIFORNIA WATERSHED ENGINEERING <br /> 4— <br /> Jason Pereira, P. ., CPSW <br /> Principal <br /> "Engineering Solutions to Improve the Quality of Life." <br />