My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
401
>
2800 - Aboveground Petroleum Storage Program
>
PR0528236
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 9:41:10 AM
Creation date
10/10/2018 4:32:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528236
PE
2832
FACILITY_ID
FA0016613
FACILITY_NAME
RIPON USD-MAINT/OPERATIONS DEPT
STREET_NUMBER
401
Direction
N
STREET_NAME
PINE
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25905014
CURRENT_STATUS
01
SITE_LOCATION
401 N PINE ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Salli-Anne Newhard PR#10648 <br /> March 30, 2010 Page 2 <br /> CWE will submit one (1) draft hard copy for your review and approval and make any necessary revisions <br /> and submit two (2) final hard copies for your use. <br /> PROJECT SCHEDULE <br /> Our services will be scheduled upon receipt of your written authorization. Verbal information can be <br /> presented to you during the course of our SPCC Plan preparation. CWE will provide you with a list of <br /> items that will be required as part of the SPCC Plan preparation. The SPCC Plan will be prepared in <br /> approximately four (4) weeks from receiving your approval to start work and receiving all the information <br /> to complete the SPCC Plan. <br /> ESTIMATED FEES AND CONDITIONS <br /> Our services will be performed in accordance with this proposal. Our estimated fee to prepare this SPCC <br /> Plan as described in the scope of services above is $2,615. <br /> This cost does not include: meetings and submittals to the local CUPA or any other agency; review or <br /> approval fees; and other items not listed in the above Scope of Services. Any additional consultation <br /> would be performed on a"time and materials"basis. <br /> Thank you for the opportunity to submit this proposal and for taking the time to review our submittal. <br /> We look forward to working with you. If this proposal and cost estimate is acceptable please send us a <br /> written notice to proceed. If you have any questions or require additional information, please contact me <br /> at (714) 385-2602 or jpereira@cwecorp.com. <br /> Respectfully submitted, <br /> CALIFORNIA WATERSHED ENGINEERING <br /> 4— <br /> Jason Pereira, P. ., CPSW <br /> Principal <br /> "Engineering Solutions to Improve the Quality of Life." <br />
The URL can be used to link to this page
Your browser does not support the video tag.