My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
2323
>
2800 - Aboveground Petroleum Storage Program
>
PR0528393
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 4:47:28 PM
Creation date
10/10/2018 4:36:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528393
PE
2832
FACILITY_ID
FA0009156
FACILITY_NAME
CALAMCO
STREET_NUMBER
2323
Direction
W
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
01
SITE_LOCATION
2323 W PORT RD G
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.s'-ov.org/ehd/unitiii.htm] <br /> CONTINUATION FORM Page: 1 ON <br /> OFFICIAL INSPECTION REPORT Date: 11/17/11 <br /> Facility Address: 2323 W. Port Rd. G, Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II, or MINOR-Notice to Comply) <br /> "The following issues were noted based on the review of the SPCC Plan (submitted in response to the <br /> October 14, 2011 inspection)." <br /> -- The Professional Engineer (PE) certification is incomplete and includes only the PE stamp and <br /> signature. The PE certification must include all of the aspects in 40 CFR Part 112.3(d)(1), including <br /> attesting that the PE is familiar with 40 CFR 112, he or his agent has visited and examined the facility, <br /> the Plan has been prepared in accordance with good engineering practice, including consideration of <br /> applicable industry standards, procedures have been established for required inspections and testing, <br /> and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility's <br /> Spill Prevention Control and Countermeasure (SPCC) plan. <br /> -- According to the cover sheet, the SPCC Plan was last reviewed on August 29, 2005. No review <br /> documentation was included in the Plan. A review and evaluation of the plan must be conducted at least <br /> once every 5 years. As a result of this review and evaluation, the SPCC Plan must be amended within 6 <br /> months of review, and recertified by a professional engineer if any technical amendments were made. <br /> You must document your completion of the review and evaluation, and must sign a statement as to <br /> whether you will amend the Plan, either at the beginning or end of the Plan, or in a log or appendix to the <br /> Plan. The following words will suffice: <br /> "I have completed the review and evaluation of the SPCC Plan for (name of facility) on (date), and will <br /> (will not) amend the Plan as a result." <br /> Immediately a review of the facility SPCC Plan and make any necessary amendments, including all <br /> necessary documentation of the Plan reviews and ensure that future Plan reviews are properly <br /> documented. <br /> -- The SPCC Plan does not follow the order or requirements in 40 CFR Part 112, and a cross-reference <br /> was not provided. If you do not follow the sequence specified in 40 CFR 112 for the Plan, you must <br /> prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the Plan to include a cross- <br /> reference or to follow the required sequence. <br /> -- A written management approval section was not included in the SPCC Plan. The Plan must have the <br /> full approval of management at a level of authority to commit the necessary resources to fully implement <br /> the plan. Immediately obtain required management approval for the SPCC Plan for this facility. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> �tcz <br /> EHD 23-02-003 v07/12/11 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.