Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.slgov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 2 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 11/17/11 <br /> Facility Address: 2323 W. Port Rd. G, Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> -- The facility map does not include 55 gallon motor oil drums or the connecting diesel piping. The Plan <br /> shall include a facility diagram which must mark the location and contents of each fixed storage <br /> container and the storage area where mobile or portable containers are located. It must identify the <br /> location of and mark as "exempt" underground tanks. It must also include all transfer stations and <br /> connecting pipes, including intra-facility gathering lines. Immediately update the facility diagram to <br /> include all of the required information. Submit a legible copy of the updated facility diagram to the EHD. <br /> -- The inventory listed in the SPCC Plan does not include the 55 gallon motor oil drums. Discharge & <br /> drainage controls and potential equipment failure are not addressed for the unlisted containers. The <br /> SPCC Plan must include the correct type of oil and storage capacity of each fixed storage container, and <br /> either the type of oil and storage capacity of each portable container or an estimate of the potential <br /> number of portable containers, types of oil, and anticipated storage capacities. The Plan must include <br /> discharge or drainage controls, such as secondary containment around all containers and other <br /> structures, equipment, and procedures for the control of a discharge, and a prediction of the direction, <br /> rate of flow, and total quantity of oil which could be discharged as a result of each type of major <br /> equipment failure. Immediately update the inventory and discharge information in the SPCC Plan to <br /> accurately represent the petroleum storage at the facility. <br /> -- The SPCC Plan does not address countermeasures for discharge discovery, response, and cleanup. <br /> The Plan must address countermeasures for discharge, response, and cleanup (both the facility's <br /> capability and those that might be required of a contractor). Immediately update the Plan to include the <br /> required discharge countermeasures. <br /> -- The SPCC Plan does not address disposal of spill cleanup materials. The Plan must address <br /> methods of disposal of recovered materials. Immediately update the plan to include appropriate <br /> methods for disposal of any recovered materials in accordance with applicable legal requirements. <br /> -- A contact list is not included in the SPCC Plan. The SPCC Plan must include a contact list and phone <br /> numbers for the facility response coordinator, National Response Center, cleanup contractors with <br /> whom you have an agreement for response, and all appropriate federal, state, and local agencies who <br /> must be contacted in case of a discharge. Immediately prepare a contact list to include the most current <br /> version of the required information. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> EHD 23-02-00 ev07/12/11 CONTINUATION FORM <br />