My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2800 - Aboveground Petroleum Storage Program
>
PR0527228
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 4:04:10 PM
Creation date
10/11/2018 1:34:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527228
PE
2832
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> o NAY 26 2011 <br /> California Tank Lines, Inc. ENVIRONMENTAL HEALTH <br /> TANK TRUCK TRANSPORTATION PERMIT/SERVICES <br /> PHONE(209)466-3554 <br /> POST OFFICE BOX 6245 STOCKTON, CALIFORNIA 95206 FAX (209)466-1855 <br /> May 26,2011 <br /> Ms. Stacy Rivera, Sr. REHS <br /> San Joaquin County Unified Program Agency <br /> Environmental Health Department <br /> 600 E.Main Street <br /> Stockton,CA 95202-3029 <br /> Re: Hazardous Waste Program Inspection—3105 S. El Dorado St.—4/25/2011 <br /> Dear Ms. Rivera: <br /> This responds to the violations noted in the check list and report for the referenced inspection on <br /> 4/25/2011. <br /> Item 4.Incomplete tank assessment for the wastewater treatment plant.A revised Tank and <br /> Containment Assessment has been prepared for the wastewater tank(s)and for the caustic tank. <br /> Copies are enclosed. <br /> Item 10. Waste minimization certification.Please see the certification and request enclosed. <br /> Item 33.Annual financial assurance.Please see the certification and closure cost estimate <br /> enclosed. <br /> Item 49.A written training program not available on site.Please see the Personnel Training write <br /> up enclosed. <br /> Items 18, 19,21,24,27,28,31,32, 33,48, 50&53,relating to the SPCC. Please see the revised <br /> SPCC enclosed,along with a copy of training checklist for oil handling personnel covering <br /> training conducted on May 26,2011. <br /> Certification of Return to Compliance is enclosed. <br /> Thank you for a very thorough inspection of our facility. We will use the very comprehensive <br /> checklists to guide our efforts to stay in compliance. <br /> Sincerely, <br /> Jack Bishop <br />
The URL can be used to link to this page
Your browser does not support the video tag.