Laserfiche WebLink
,D. ,Results of Testing/Servicing <br /> Software Version Installed: 328.03 <br /> Complete the foRowing checklist: <br /> ® Yes ❑No* Is the audible alarm operational? <br /> ® Yes El No* Is the visual alarm operational? <br /> ® Yes ❑No* Were all sensors visually inspected,finictionally tested,and confirmed operational? <br /> ® Yes ❑No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑Yes ❑No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> ®N/A <br /> ❑Yes ❑No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ®N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?❑Yes ❑No <br /> ®Yes ❑No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ❑N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill <br /> point(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm trigger? 90% <br /> ❑ Yes* ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ®No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product ❑ Water If yes,describe causes in Section E,below. <br /> ® Yes ❑No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ®Yes ❑No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Other sensors : L2 floor by TLS (model 794380-208) , L3 Rupture basin Day tank(model 794390-420) ,L4 Floor <br /> far wall (model 794380-208) <br /> Page 2 of 3 11/06 <br />