My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
6855
>
2800 - Aboveground Petroleum Storage Program
>
PR0528407
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 9:08:16 AM
Creation date
10/11/2018 1:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528407
PE
2831
FACILITY_ID
FA0010561
STREET_NUMBER
6855
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
CURRENT_STATUS
01
SITE_LOCATION
6855 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/ SIR Equipment: <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foRowing checklist: <br /> ® Yes 11 ❑No* I Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑No* Was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> ®Yes No* Were all probes reinstalled properly? <br /> ®Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ® Check this box if LLDs are not installed. <br /> Complete the foRowing checklist: <br /> ❑Yes No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑N/A (Check all that apply) Simulated leak rate: ❑3 . .h. ❑0.l .h. ❑0.2 . .h. <br /> EI-Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> ❑ Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A malfunctions or fails a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 11/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.