My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7501
>
2800 - Aboveground Petroleum Storage Program
>
PR0539001
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:46 AM
Creation date
10/11/2018 1:57:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539001
PE
2832
FACILITY_ID
FA0022384
FACILITY_NAME
Eleventh Street Chevron
STREET_NUMBER
7501
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
Tracy
Zip
95304
APN
25014017
CURRENT_STATUS
01
SITE_LOCATION
7501 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Eleventh Street Chevron 7501 W ELEVENTH ST, TRACY September 20, 2017 <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section D V ❑R ❑COS <br /> 602 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable V ❑R ❑COS <br /> 603 CFR 112.7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan n V ❑R ❑COS <br /> 604 CFR 112.7(a)(3)(i) Plan failed to include oil type and storage capacity for each container V ❑R ❑COS <br /> 605 CFR 112.7(a)(3)(ii) Plan failed to adequately discuss discharge prevention measures,including routine handling V ❑R ❑COS <br /> 606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls V ❑R ❑COS <br /> 607 CFR 112.7(a)(3)(iv) Plan failed to include countermeasures for discharge discovery,response and cleanup 3 V ❑R ❑COS <br /> 608 CFR 112.7(a)(3)(v) Plan failed to address disposal methods for recovered materials V ❑R ❑COS <br /> 609 CFR 112.7(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge m V ❑R ❑COS <br /> 1112.7(a4) <br /> 610 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan V ❑R ❑COS <br /> 611 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence V ❑R ❑COS <br /> 612 CFR 112.7(c) Plan failed to include secondary containment,diversionary structures,or equip to prevent discharge V ❑R ❑COS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment,diversionary structures or equipment m V ❑R ❑COS <br /> 614 CFR 112.7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures 3 V ❑R ❑COS <br /> 615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability V ❑R ❑COS <br /> 616 CFR 112.7(d)(1) Failure to prepare an oil spill contingency plan when claiming impracticability of structures 3 V ❑R ❑COS <br /> 617 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge V ❑R ❑COS <br /> 618 CFR 112.7(e),112.8(c) Failed to conduct inspections or integrity tests or maintain records for 3 years n V ❑R ❑COS <br /> 6 <br /> 619 CFR 112.7(f)(1) Failed to train personnel on discharge prevention V ❑R ❑COS <br /> 620 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention V ❑R ❑COS <br /> 621 CFR 112.7(f)(3) Failed to schedule and conduct discharge prevention briefings at least annually n V ❑R ❑COS <br /> 622 CFR 112.7(f)(3) Failure to conduct spill prevention briefing for oil-handling personnel n V ❑R ❑COS <br /> 623 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting V ❑R ❑COS <br /> 624 CFR 112.7(g) Facility failed to implement security of site and valves,lock out/tag out,and lighting V ❑R ❑COS <br /> 625 CFR 112.7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack V ❑R ❑COS <br /> 626 CFR 112.7(h)(1) Loading/unloading rack containment system not adequate to contain spill V ❑R ❑COS <br /> 627 CFR 112.7(h)(2) Failed to provide vehicular departure system for loading and unloading racks V ❑R ❑COS <br /> 628 CFR 112.7(h)(3) Failed to inspect lowermost drains and outlets prior to filling and departure of vehicles V ❑R ❑COS <br /> 629 CFR 112.7(i) Failed to evaluate field constructed container for brittle fracture and take appropriate action V ❑R ❑COS <br /> 630 CFR 112.7(k) Failure to provide general secondary containment or alternative for oil-filled operational equipment V ❑R ❑COS <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 701 CFR 112.8(b)(1) Failure to ensure drainage from diked areas is restrained by valves or alternative method V ❑R ❑COS <br /> 702 CFR 112.8(b)(2) Failed to use manual open-and-closed design valves for the drainage of diked areas V ❑R ❑COS <br /> Page 2of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.