My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
14201
>
2800 - Aboveground Petroleum Storage Program
>
PR0516683
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:08:20 AM
Creation date
10/11/2018 2:46:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516683
PE
2831
FACILITY_ID
FA0001516
FACILITY_NAME
UNION POINT MARINA BAR & GRILL INC
STREET_NUMBER
14201
Direction
W
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
13113005
CURRENT_STATUS
01
SITE_LOCATION
14201 W HWY 4
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oil Program <br /> 75 Hawthorne St., ENF-3-2 <br /> San Francisco CA 94105 <br /> 415 972 3089 <br /> fax 415 947 3519 <br /> Repan oil or <br /> chemlcal spills at <br /> 800-A24-8802 <br /> From: Witul,Janice <br /> Sent: Wednesday, September 05, 2018 11:07 AM <br /> To: 'caseylrogers@aol.com' <caseylrogers@aol.com>; 'bevkent09 @sbcgloba 1.net' <bevkent09@sbcgloba1.net> <br /> Cc: 'cruvalcaba@sjcehd.com' <cruvalcaba@sicehd.com> <br /> Subject: RE: Union Point SPCC Plan <br /> My review of the SPCC Plan that was prepared for Union Point Marina has noted the following areas of non-compliance <br /> with the Oil Pollution Prevention requirements of 40 C.F.R. 112 - <br /> 4 0 G�A R. 14 2.22 Q-4 means 901 ef any kind 9F in any feFm, including, but not limited te: fats, 901, 9F greases ef animal, , <br /> greases,er marine mammal eFigin; vegetable eels, including eils fFern seeds, nuts, fruits, 9F kernels; and, ether gals and <br /> 0 neluding petroleum, f6iel 941, sludge, synthetie eel, mineral eels, 901 refuse, or eel mixed ;Agith ;Ag-astes ether than dredges <br /> k <br /> I_IR6A_R PA_6Rt-SPr-.r-. PlaR *_9 h_a_9P_C_I A_R a Af eil ether than that fe-ind 40 G F R 112 If there ;arp rARtA6RPrq 5151 <br /> gallens eir greater ef nen petireleurn, new er waste eils 9F girease-s a-s-se-ciated with the Marina 9F Grill,they sheuld be <br /> aCICIPCI to the coCr oi.,R <br /> 40 G.F-.R. 112.6(G)(1) requires that_an evdner or eperater v.dhe de-e-S net prepare a self-certified Plan must prepare and <br /> mplement a Plan meeting the general Plan requirements in §112.7 and applicable ,equi.e...—its in subparts B and C, <br /> neluding having the Plan certified by a Prefesswenal Engineer as required under§112.3(d). <br /> Union Point SPGG Plan is net by a Professional Engineelr4PE+- <br /> 40 C.F.R. 112.7(a)(3)(i) requires that the SPCC Plan address the type of oil in each fixed container and its storage <br /> capacity. <br /> Union Point SPCC Plan variously describes the facility has having: one 2000-gallon storage tank; a 1,000 gallon#2 <br /> diesel tank and a 1,000 gallon gasoline tank; a 10,000 gallon fuel tank; lube oils; and used oils. Used cooking oil tank <br /> has been added to Plan; tank location, secondary containment, inspections, and transfer/disposal of contents are <br /> not addressed. <br /> 40 C.F.R. 112.7(a)(3)(ii) requires that the SPCC Plan addresses discharge prevention measures including procedures for <br /> routine handling of products (loading, unloading, and facility transfers, etc.) Union Point SPCC Plan instructions for <br /> loading, unloading and transfer of oil include require that "The qualified person must have an unconstructive view of <br /> the cargo tank and delivery hoses". This instruction is contrary to best management practices,which require that <br /> such an attendant have a clear view of the equipment and process. <br /> 40 C.F.R. 112.7(a)(3)(vi) requires that the SPCC Plan include a contact list and phone numbers for the facility response <br /> coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all <br /> appropriate Federal, State, and local agencies who must be contacted in case of a discharge as described in §112.1(b). <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.