My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
166
>
2800 - Aboveground Petroleum Storage Program
>
PR0515523
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:09:52 AM
Creation date
10/11/2018 3:54:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515523
PE
2832
FACILITY_ID
FA0006289
FACILITY_NAME
VALLEY PACIFIC PETROLEUM SERVICES
STREET_NUMBER
166
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342003
CURRENT_STATUS
01
SITE_LOCATION
166 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommendations Letter <br /> Formal External Inspection of AST-3 <br /> Valley Pacific Petroleum Services,Inc. <br /> Page 2 <br /> • Water-finding paste was used to determine if water was present in both compartments of the tank. <br /> Water was not found in either compartment of the tank. <br /> Shell Testing <br /> Ultrasonic thickness(UT)measurements were recorded in order to establish an inspection baseline for use <br /> during future inspections with the purpose of identifying corrosion. Measurements and visual inspection <br /> of the tank shells revealed no internal or exterior corrosion. Refer to the tank diagram, Attachment A, for <br /> thickness measurements and photographs attached to the formal report. <br /> Recommendations for Continued Use <br /> Based on current industry practices and regulatory requirements, Condor recommends the following: <br /> • Periodic inspection and maintenance of the normal vents by Facility personnel is recommended <br /> for proper vent operation. <br /> • Periodic checks for proper emergency vent operation are recommended. During Condor's <br /> inspection, the tank's long-bolt manway covers did not lift easily and may have been <br /> inadvertently sealed. <br /> • Installation of an overfill valve and/or a basic high liquid level vent whistle (alarm) is <br /> recommended in order to prevent overfill. <br /> • Perform and document monthly and annual inspections in accordance with the Facility Spill <br /> Prevention, Control, and Countermeasures (SPCC)Plan. <br /> These recommendations should be implemented as soon as feasible. If you have any comments or <br /> questions,please contact us at(209)234-0518. <br /> Sincerely, <br /> CONDOR EART <br /> ord J nson,AS Inspector No. AST-T10388 <br /> Environm tal S alist <br /> XAProject\7000_pr\7167 Valley Pacific Petroleum NONA Support\7167C S1ockton\7167C2 Tank Inspectiom\Reports\AST-3\FR 20181001 FEIR AST-3.doc <br /> �i(= CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.