My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
166
>
2800 - Aboveground Petroleum Storage Program
>
PR0515523
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:09:52 AM
Creation date
10/11/2018 3:54:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515523
PE
2832
FACILITY_ID
FA0006289
FACILITY_NAME
VALLEY PACIFIC PETROLEUM SERVICES
STREET_NUMBER
166
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342003
CURRENT_STATUS
01
SITE_LOCATION
166 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In-Service AST Inspection Report <br /> Formal External Inspection of 8,550-Gallon Tank(AST-2) <br /> Valley Pacific Petroleum Services,Inc. <br /> Page 5 <br /> mm) intended for use on steel plate and piping materials used in storage tank applications. The meter is <br /> capable of collecting readings using a scan mode or single point mode. The meter is factory calibrated <br /> (November 23, 2016) and proper operation confirmed prior to and during testing using a steel calibration <br /> block adhered to the side of the meter. The transducer couplant used was NDT Systems UTG1102 <br /> Ultragel II. Field data was recorded onsite. Refer to Figure 1, Attachment A, for a tank diagram and UT <br /> measurements. <br /> Requirements for Continued Tank Service <br /> The STI Standard for Inspection requires the owner or operator of an aboveground tank to perform and <br /> document periodic inspections. Refer to the checklists contained in the Facility's Spill Prevention, <br /> Control, and Countermeasures (SPCC) Plan. These documents should be completed by the owner or <br /> operator on a monthly and annual basis as part of the SPCC Plan. <br /> The following recommendations are based on the requirements of SP-001 and UL 142. These documents <br /> are industry standards. <br /> 1. The normal operating vents must be fully operational to prevent damage from overpressure or <br /> vacuum during product transfer. Periodic inspection and maintenance of the normal vents by <br /> Facility personnel is recommended for proper vent operation. <br /> 2. The emergency vents must be fully operational and move freely to allow opening if overpressure <br /> occurs. Long bolts on the manway must not be bolted shut and should have a minimum of 2- <br /> inches of thread showing to allow the manway to open while under pressure. Periodic checks for <br /> proper emergency vent operation are recommended. <br /> 3. Based on the STI Standard (SP-001), as a Category 1 tank, the interval until the next certified <br /> formal external inspection is 20 years. If the Facility uses an alternate standard or chooses to <br /> provide "equivalent environmental protection" in lieu of routine integrity testing, the method and <br /> schedule for such should be included in the Facility's SPCC Plan. <br /> a. If the Facility SPCC Plan requires the use of routine"integrity testing"using SP-001,then the <br /> following routine inspections should be completed by the tank owner/operator. Specific <br /> inspection items may be modified for the tank's specific use as necessary; however, <br /> deviations from or alterations of the STI Standard should be discussed in the Facility SPCC <br /> Plan. <br /> 4. Effective September 2011, the STI Standard for Inspection requires the owner or operator of an <br /> aboveground tank to perform and document periodic inspections. Refer to the checklists <br /> contained in Appendix B. These documents should be completed by the owner or operator on a <br /> monthly and annual basis. <br /> Suitability for Continued Service <br /> Based on the STI criteria and results/recommendations of the current inspection, Condor formally <br /> approves continued use of the AST-2. A 20-year formal external inspection schedule, as a Category 1 <br /> tank, is required following the FEI date. Federal, state and/or local regulations may require more frequent <br /> inspections of the tank. <br /> 4.0 RECORD KEEPING <br /> 1. Tank original manufacturer records, if able to be located, should be retained for the life of the <br /> tank. <br /> t�_4 <br /> �� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.