My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
166
>
2800 - Aboveground Petroleum Storage Program
>
PR0515523
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:09:52 AM
Creation date
10/11/2018 3:54:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515523
PE
2832
FACILITY_ID
FA0006289
FACILITY_NAME
VALLEY PACIFIC PETROLEUM SERVICES
STREET_NUMBER
166
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342003
CURRENT_STATUS
01
SITE_LOCATION
166 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In-Service AST Inspection Report <br /> Formal External Inspection of 8,550-Gallon Tank(AST-2) <br /> Valley Pacific Petroleum Services,Inc. <br /> Page 6 <br /> 2. Monthly Inspection Checklists should be completed by the owner/operator and retained for a <br /> minimum of 3 years. <br /> 3. Annual Inspection Checklists should be completed by the owner/operator and retained for a <br /> minimum of 3 years. <br /> 4. Certified Inspection Reports should be retained for the life of the AST system. <br /> 5.0 LIMITATIONS <br /> The recommendations stated in this Report are based on good engineering practices and industry <br /> standards; however, they are not specific regulatory requirements or requirements for continued service. <br /> Tanks should be clearly labeled with the product stored, capacity of the tank and an NFPA hazard label, <br /> as a minimum. Piping should be labeled with the product and flow direction. <br /> Notwithstanding any observation,recommendation, opinion contained in this Report, nothing herein shall <br /> be construed as a representation, warranty or guarantee, either expressed or implied, regarding the future <br /> structural integrity, life expectancy, or performance of the tank. This Report and the analysis provided is <br /> in all respects subject to and shall be interpreted within the limitations and parameters of the test <br /> procedures performed. In the event testing is performed using a sampling procedure, this Report and any <br /> analysis shall be limited to those areas actually tested and the type of test conducted, and the customer is <br /> cautioned not to extrapolate the results of the test samples. <br /> This Report of inspection is not to be construed as an expressed or implied warranty of future <br /> performance of the tank. Should you have any questions or comments concerning this inspection report, <br /> please do not hesitate to contact the undersigned at(209)234-0518,Ext. 2239. <br /> Sincerely, <br /> CONDOR EART <br /> (rd J nson,AST nspector No. AST-T10388 <br /> Environm tal Spe alist <br /> X:\Prolect\7000_prl\7167 Valley Pacific Petroleum NONA Support\7167C S1ockton\7167C2 Tank Inspections\Reports\AST-2\FR 20181001 FEIR AST-2.doc <br /> vx_� <br /> �(= CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.