Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC — STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-2 <br /> Inspection Date: February 15, 2017 <br /> Photo 5: Southeast end of AST-2 with 3-inch tank fill connection (top, out of picture) and 3- <br /> inch capped drain port(bottom). <br /> Photo 6:Northwest end of AST-2 with capped 3-inch drain port(bottom). <br /> �I= CONDOR <br />