Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC — STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-2 <br /> Inspection Date: February 15, 2017 <br /> l � - <br /> Photo 7: Southeast side of AST-2 showing long-bolt manways, external tank-mounted <br /> pumps, and piping connections. <br /> ;A_ j <br /> Abik <br /> CONFINED <br /> SPACE <br /> DO NOT ENTER <br /> WITHOUT PERMIT <br /> NO SMS � <br /> KING <br /> An <br /> Photo 8: Northeast side of AST-2 showing long-bolt manway, external tank-mounted pump, <br /> and piping connections. <br /> too CONDOR <br />