Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC — STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-1 <br /> Inspection Date: February 15, 2017 <br /> X <br /> I '- <br /> Photo 3:North,northwest side of AST-1. <br /> r a ` N r, <br /> .4 <br /> �• i <br /> 3: <br /> _3 <br /> Photo 4: West, southwest side of AST-1 (left tank). <br /> �� CONDOR <br />