Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC — STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-1 <br /> Inspection Date: February 15, 2017 <br /> Photo 5: Southeast end of AST-1 with 3-inch tank fill connection(top) and 3-inch capped drain port <br /> (bottom). <br /> t <br /> Photo 6:Northwest end of AST-1 with capped 3-inch drain port(bottom). <br /> �� CONDOR <br />