My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARTHUR
>
23534
>
2800 - Aboveground Petroleum Storage Program
>
PR0524264
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:38:55 PM
Creation date
10/11/2018 4:24:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0524264
PE
2832
FACILITY_ID
FA0006141
FACILITY_NAME
A L POWELL TRUCKING
STREET_NUMBER
23534
Direction
E
STREET_NAME
ARTHUR
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
22903010
CURRENT_STATUS
01
SITE_LOCATION
23534 E ARTHUR RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sogov.org/ehd <br />ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br />CONTINUED <br />Facility A L Powell Trucking Co <br />Addy": 23534 E Arthur Road, Escalon <br />InsDae�On Sep 29, 2010 <br />Name: <br />VIOLATIONS <br /># <br />V <br />R <br />Code Section <br />HSC = CA Heatth and Saf Code; CFR = Code of Federal Regulations V = Vidabon; RV = R dation <br />S Ic requirements of HSC 25270.4.5 a are identified as CFR code sections inni with 112 <br />27 <br />CFR 112.7(b) <br />SPCC Plan failed to include a description of potential equipment failure (direction, flow rate, quantity), or <br />provide equivalence as allowed by CFR 112.7(a)(2) <br />28 <br />CFR 112.7(c) <br />Failed to provide secondary containment and/or diversionary structures that are capable of containing <br />discharge from primary containment until it is cleaned u <br />Failed to provide explanation, conduct periodic integrity testing of containers and/or periodic integrity and <br />29 <br />CFR 112.7(d) <br />leak testing for valves and piping if containment or discharge prevention structures were determined to be <br />impracticable on an SPCC Plan or sections of one that is PE certified <br />If a response plan was not submitted to the RA, and containment or discharge prevention structures were <br />30 <br />CFR 112.7(d) <br />determined to be impracticable, the SPCC Plan failed to provide: (1) an oil spill contingency plan, (2) <br />written commitment of manpower, equipment, materials to control and remove oil discharge <br />31 <br />CFR 112.7(e) <br />Failed to conduct inspections and tests in accordance with written procedures and/or maintain signed <br />records of inspections and tests as required by the facility's SPCC Plan on site for 3 years <br />Failed to: (1) train personnel on discharge prevention; (2) designate a person to be accountable for <br />32 <br />CFR 112.7(f) <br />discharqe prevention; or 3) schedule prevention discharge prevention briefings at least annual) <br />Failed to describe how the oil handling, processing and storage areas are secured and controlled; how <br />33 <br />CFR 112.7(g) <br />master flow and drain valves are secured; how unauthorized access to starter controls on oil pumps are <br />prevented, how out -of -service and loading/unloading connections are secured, the appropriateness of <br />security lighting; or provide equivalence as allowed by CFR 112-7(a)(2) <br />Failed to provide sufficient secondary containment capacity for tank car or tank truck loading and <br />34 <br />CFR 112.7(h)(1) <br />unloading area if drainage area is not designed to flow into a catchment basin designed to handle <br />discharges <br />Failed to provide methods to prevent vehicles from departing loading and unloading areas before complete <br />35 <br />CFR 112.7(h)(2) <br />disconnection of transfer lines or provide equivalence as allowed by CFR 112.7(a)(2) <br />Failed to inspect lower-most drains and all outlets of vehicles for discharge prior to filling and departure <br />36 <br />CFR 112.7(h)(3) <br />and take appropriate measures to prevent liquid discharge while in transit or provide equivalence as <br />allowed b CFR 112-7(a)(2) <br />Failed to evaluate field -constructed container for risk of discharge or failure due to brittle facture or other <br />37 <br />CFR 112.7(i) <br />catastrophe after repair, alteration, reconstruction, or change in service, or provide equivalence as allowed <br />by CFR 112.7a 2 <br />SPCC Plan failed to include a complete discussion of conformance to discharge prevention and <br />38 <br />CFR 112.70) <br />containment procedures as listed in part 112 and any applicable more stringent State rules, regulations, <br />and guidelines <br />If a response plan was not submitted to the RA, and secondary containment is not provided for qualified <br />oil -filled equipment, the SPCC Plan failed to: (i) establish and document procedures for inspection or a <br />39 <br />CFR 112.7(k)(2) <br />monitoring program to detect equipment failure and/or discharge, (ii) provide oil spill contingency plan <br />and/or written commitment of manpower, equipment, materials to control and remove oil discharge <br />Failed to prevent discharge into the drainage system from diked storage areas and/or inspect <br />40 <br />CFR 112.8(b)(1) <br />accumulation prior to drainage, or provide equivalence as allowed by CFR 11 2.7 a 2 <br />Failed to use manual, open -and -closed design valves for the drainage of diked areas, or provide <br />41 <br />CFR 112.8(b)(2) <br />equivalence as allowed by CFR 112.7(a)(2) <br />Failed to design facility drainage system from undiked areas to flow into appropriate ponds, lagoons, or <br />42 <br />CFR 112.8(b)(3) <br />catchment basins (in areas not subject to flooding) designed to retain oil or return it to the facility, or <br />provide equivalence as allowed by CFR 112.7(a)(2) <br />Failed to equip the final discharge of all ditches with a diversion system that would retain oil in the facility in <br />43 <br />CFR 112.8(b)(4) <br />the event of an uncontrolled discharge if CFR112.8(b)(3) is not met, or provide equivalence as allowed by <br />CFR 112-7(a)(2 <br />Failed to provide two "lift" pumps, one permanently installed, where drainage waters are continuously <br />44 <br />CFR 112.8(b)(5) <br />treated in more than one treatment unit, or provide equivalence as allowed by CFR 112-7(a)(2) <br />Container not compatible with oil stored and/or storage conditions, or failed to provide equivalence as <br />45 <br />CFR 112.8(c)(1) <br />allowed by CFR 112.7(a)(2) <br />Failed to provide sufficient secondary containment capacity for a bulk storage tank that would hold the <br />46 <br />CFR 112.8(c)(2) <br />volume of the largest container plus sufficient freeboard to contain precipitation and/or diked area is not <br />sufficiently impervious to contain discharged oil <br />Allowed drainage of uncontaminated rainwater from a diked area and failed to: (i) keep bypass valves <br />sealed closed, (ii) inspect retained rainwater prior to discharge, (iii) open bypass valve and reseal it under <br />47 <br />CFR 112.8(c)(3) <br />responsible supervision; (iv) maintain adequate records of such events; or provide equivalence as allowed <br />by CFR 112.7a(2 <br />Inspector Phone: <br />(209) 468-3439 <br />Rved <br />; <br />Title <br />(t le rn <br />EHD 28-02 Rev 2/19/10 Page 2 APSA INSPECTION REPORI <br />
The URL can be used to link to this page
Your browser does not support the video tag.