Laserfiche WebLink
Stockton Steel SPCC Plan <br /> Addendum A <br /> Owner Operator Certification (§112.6 (a)(1)) <br /> I hereby certify that i am familiar with the requirements of the SPCC rule(40 CFR 112). <br /> Furthermore, I certify that I have examined the subject facility,reviewed this SPCC Plan and <br /> concluded that it is accurate and complete and that it was prepared in accordance with accepted and <br /> sound industry practice.The plan,including all inspection and testing requirements,has been fully <br /> implemented. The plan is approved by top management. In the event of an oil spill,Stockton Steel <br /> will make available all manpower, equipment and materials necessary to expeditiously control and <br /> remove any quantity of oil discharge that may be harmful to the environment. <br /> Owner/Operator's Signature: <br /> Owner/Operator's Name,Title: Derric Juano /Plant Superintendent <br /> Date: 8/22/13...- <br /> 3003 East Hammer Lane, Stockton, CA 95212 (209) 956-4751 <br />