Laserfiche WebLink
Spill Prevention Control and <br /> Countermeasure Plan <br /> Attachment 3 -SPCC Plan <br /> Spill Prevention Briefing <br /> Stockton Steel,Stockton,California <br /> Location: ��,. T"X-,KT O <br /> Date of Briefing 443 ?1_' 13 i <br /> Briefing Conducted By: C"91 G <br /> The following items were discussed at the meeting: <br /> (Check items discussed) <br /> SPCC Plan and,associated rules and regulations <br /> . Spill events or failures at this or other facilities <br /> 4 Operation and maintenance of equipment to prevent oil spills <br /> Spill reporting procedures <br /> �14�G�} $rGG V <br /> Other a O <br /> Personnel in Attendance: <br /> 1. <br /> 2. ADAM P,7000A V 12. <br /> 3. �E:D13. <br /> 4. LOAT 14. <br /> 5. 1>1 LL, VAU <Srf YN 15. <br /> 6. 16. <br /> 7. 17. <br /> 8. 18. <br /> 9. 19. <br /> 10. 20. <br /> The briefing report should be kept with the SPCC Plan for three years. <br /> Copy this original for use during briefings. <br /> Revision Date 07125111 <br />