My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3003
>
2800 - Aboveground Petroleum Storage Program
>
PR0528317
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:57:45 PM
Creation date
10/15/2018 2:42:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528317
PE
2832
FACILITY_ID
FA0004400
FACILITY_NAME
STOCKTON STEEL CO
STREET_NUMBER
3003
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618002
CURRENT_STATUS
01
SITE_LOCATION
3003 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garrett Backus [EH] <br /> From: Garrett Backus [EH] <br /> Sent: Friday,January 17, 2014 9:40 AM <br /> To: Juano, Derric <br /> Cc: 'Ron Fleming' <br /> Subject: RE: Stockton Steel - Updated and Certified SPCC Plan <br /> Hi Derric, <br /> I reviewed the SPCC plan and violations 504 and 505 are resolved. <br /> Garrett Backus <br /> Lead Senior Registered Environmental Health Specialist <br /> San Joaquin County Environmental Health Department <br /> 1868 E Hazelton Ave, Stockton, CA 95205 <br /> Phone: (209)468-2986 <br /> Fax: (209)468-3433 <br /> Email: gbackus@sicehd.com <br /> From: Ron Fleming [mailto:ronC)secainc.com] <br /> Sent: Tuesday, January 14, 2014 12:35 PM <br /> To: Garrett Backus [EH] <br /> Cc: Juano, Derric <br /> Subject: Stockton Steel - Updated and Certified SPCC Plan <br /> Garrett, <br /> Good afternoon. <br /> Attached is the updated and certified SPCC plan for the Stockton Steel facility (a copy has been uploaded to CERS). <br /> Below is a summary of the Plan updates. We believe these satisfy the requirements necessary to close findings 504 and <br /> 505 from the recent inspection. <br /> 1. The Plan was reviewed and amended (equipment added)to make the plan complete and current (Review <br /> #1, Page 28). <br /> 2. Section 11.0(Oil-Filled Operational Equipment) was reviewed and compared to the EPA Oil-Filled Fact Sheet <br /> you provided in your Jan 6th e-mail.The table in Section 11.0 was modified to remove reference to concrete <br /> slab as secondary containment. Stockton Steel's oil spill contingency plan and a written commitment of <br /> manpower,was reviewed and determined to satisfy the requirements for oil-filled operational equipment. <br /> 3. The Plan amendments were certified by a Professional Engineer(Page 29). <br /> 4. The updated plan was uploaded into the CERS system. CERS system emergency contacts were also updated. <br /> Thank you for your patience and assistance helping us close these last findings. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.