My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
2800 - Aboveground Petroleum Storage Program
>
PR0527882
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:44:56 PM
Creation date
10/16/2018 11:53:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527882
PE
2832
FACILITY_ID
FA0004000
FACILITY_NAME
MUNICIPAL UTILITIES
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
01
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.s*gov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of 5 <br /> OFFICIAL INSPECTION REPORT Date: 05/11/11 <br /> Facility Address: 2500 Navy Dr., Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> 18. (continued) <br /> connecting pipes, including intra-facility gathering lines. Immediately update the facility diagram to <br /> include all of the required information. Submit a legible copy of the updated facility diagram to the EHD <br /> by June 12, 2011. <br /> 19, 21 & 27. The inventory listed in the SPCC Plan does not include the emergency generators or the <br /> Clarifloc totes. Discharge & drainage controls and potential equipment failure are not addressed for any <br /> of the unlisted containers. The SPCC Plan must include the correct type of oil and storage capacity of <br /> each fixed storage container, and either the type of oil and storage capacity of each portable container <br /> or an estimate of the potential number of portable containers, types of oil, and anticipated storage <br /> capacities. The Plan must include discharge or drainage controls, such as secondary containment <br /> around all containers and other structures, equipment, and procedures for the control of a discharge, <br /> and a prediction of the direction, rate of flow, and total quantity of oil which could be discharged as a <br /> result of each type of major equipment failure. Immediately update the inventory and discharge <br /> information in the SPCC Plan to accurately represent the petroleum storage at the facility. <br /> 24. The phone number for the San Joaquin County Office of Emergency Services is not included in the <br /> contact list. The alternate response coordinator has been changed from Steve Gittings to Larry Parlin. <br /> This change took place over six months ago, according to Ms. Langston-Kenney; the SPCC Plan has <br /> not been updated to reflect this change. The State Office of Emergency Services is now called the <br /> California Emergency Management Agency (CalEMA). The SPCC Plan must include a contact list and <br /> phone numbers for the facility response coordinator, National Response Center, cleanup contractors <br /> with whom you have an agreement for response, and all appropriate federal, state, and local agencies <br /> who must be contacted in case of a discharge. Immediately update the contact list to include the most <br /> current version of the required information. <br /> 31. Copies of inspection and testing records were not found on site. Inspections and tests must be <br /> conducted in accordance with the written procedures developed in the SPCC Plan. Records of these <br /> inspections and tests must be signed by the appropriate supervisor or inspector and kept on site with the <br /> SPCC Plan for a period of three years. Immediately locate a copy of all inspection and testing records <br /> for the last three years, maintain them on site, and submit copies to the EHD by June 12, 2011. <br /> 32. Annual training is not being conducted for the aboveground petroleum storage program and <br /> containers. No training records were available on site. At a minimum, oil-handling personnel must be <br /> trained in the operation and maintenance of equipment to prevent discharges, discharge procedure <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY_ IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> EHD 23-02-003 Rev 08/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.