My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
2800 - Aboveground Petroleum Storage Program
>
PR0527882
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:44:56 PM
Creation date
10/16/2018 11:53:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527882
PE
2832
FACILITY_ID
FA0004000
FACILITY_NAME
MUNICIPAL UTILITIES
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
01
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stacy Rivera <br /> August 3, 2011 <br /> Page 5 <br /> UPDATE ON RETURN TO COMPLIANCE CERTIFICATION - HAZARDOUS WASTE <br /> GENERATOR PROGRAM INSPECTION REPORT AND ABOVEGROUND <br /> PETROLEUM STORAGE ACT INSPECTION REPORT FOR CITY OF STOCKTON <br /> MUNICIPAL UTILITIES DEPARTMENT MAIN PLANT, TERTIARY PLANT AND <br /> STORES FACILITIES INSPECTIONS CONDUCTED MAY 11, 2011 <br /> 16 V 16. SPCC Plan lacks full approval of management at a level of authority to <br /> commit the necessary resources to implement the Plan <br /> The management approval section of the Spill Prevention Countermeasure <br /> N and Control Plan has not been completed. The Plan must have the full <br /> approval of management at a level of authority to commit the necessary <br /> resources to fully implement the plan. <br /> Retained the services of Condor Earth Technologies, who are in the process <br /> of conducting a Spill Prevention, Control and Countermeasures Plan <br /> R update. July 2011 Updated Draft Working Copy is being reviewed by MUD <br /> Senior management for signature and incorporates other necessary <br /> changes or provides place holders for information updates. <br /> 18 V 18. No facility diagram or diagram failed to show the location and contents <br /> of each container, transfer stations, and connecting pipes. <br /> The Facility diagram does not include the location of emergency generators <br /> N and the Clarifloc totes. The Plan shall include a Facility diagram which must <br /> mark the location and contents of each fixed storage container and the <br /> storage area where mobile or portable containers are located. <br /> Update Facilities maps are being drafted by Condor Earth Technologies <br /> R who have been retained to update the Spill Prevention, Control and <br /> Countermeasures Plan. Will provide ollow-up letter. <br /> 19 19. SPCC Plan failed to include description of product type and storage <br /> 21 capacity for each container. 21. SPCC Plan failed to show discharge or <br /> & V drainage controls (secondary containment) equipment and procedures for <br /> 27 the control of a discharge. 27. SPCC Plan failed to include a description of <br /> potential equipment failure (direction, flow rate, quantity), of provide <br /> e uivalence as allowed by CFR 112.7(a) (2). <br /> The inventory listed in the SPCC Plan does not include the emergency <br /> generators of the Clarifloc totes. Discharge and drainage controls and <br /> potential equipment failure are not addressed for any of the unlisted <br /> N containers. The SPCC Plan must include the correct type of oil and storage <br /> capacity of each fixed storage container, and either the type of oil and <br /> storage capacity of each portable container or an estimate of the potential <br /> number of portable containers, types of oil and anticipated storage <br /> capacities. <br /> Retained the services of Condor Earth Technologies, who are in the process <br /> of conducting a Spill Prevention, Control and Countermeasures Plan <br /> R update. July 2011 Updated Draft Working Copy has incorporated changes <br /> or provided place holders for information update. Will provide follow-up as <br /> plan is finalized. <br /> 24 24. SPCC Plan failed to include required contact list and phone numbers of <br /> V the facility's response coordinator, cleanup contractors and agencies to <br /> notify in case of discharge. <br /> The phone number for the San Joaquin County Office of Emergency <br /> N Services is not included in the contact list. The alternate response <br /> coordinator has been changed from Steve Gittins to Larry Parlin. This <br />
The URL can be used to link to this page
Your browser does not support the video tag.