My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BACON ISLAND
>
17251
>
2800 - Aboveground Petroleum Storage Program
>
PR0516704
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 5:26:37 PM
Creation date
10/17/2018 2:44:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516704
PE
2831
FACILITY_ID
FA0001818
FACILITY_NAME
BULLFROG LANDING MARINA
STREET_NUMBER
17251
STREET_NAME
BACON ISLAND
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
12917003
CURRENT_STATUS
01
SITE_LOCATION
17251 BACON ISLAND RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2A <br /> U.S.ENVIRONMENTAL PROTECTION AGENCY <br /> +. SUMMARY OF SPCC DEFICIENCIES <br /> Onshore Facilities(Excluding drilling,production and workover) <br /> Facility Name/Address: �',7ZZX7C'✓t,KLA Facility Start Dated c 1<_-/" <br /> inspector: ti /iZ-lr Date: :5L.LA Y SPCC#: <br /> Citation Deficiency Plan Field <br /> 112.3(a) No Spill Prevention Control and Countermeasures Plan <br /> 112.3(d); Plan not certified by a Professional Engineer(PE),not self-certified,or incomplete <br /> 112.6(a)(1)or(b)(1) <br /> 112.3(e)(1)or(2) Plan not maintained on site or not available for review <br /> I IZ3(g) Plan self-certified(or Tier I template used)though not eligible <br /> 112.5(a) No plan amendment(s)after change In:design,construction, operation,or maintenance <br /> 112.5(b) No evidence of five year review of plan by owner/operator <br /> 112.5(c); Technical amendments(s)not certified by a PE or self-certified <br /> 112.6(a)(2)or(b)(2) <br /> 112.6(b)(2) PE certified portions of Plan not certified by a PE following technical amendments <br /> 112.6(b)(3) Deviations from the SPCC rule requirements are not certified by a PE <br /> 112.7 No signed management approval of plan <br /> 112.7 Plan does not follow sequence or have a cross reference <br /> 112.7(a)(2) No or inadequate environmental equivalent for deviations from requirements <br /> 112.7(a)(3) No or incomplete facility diagram - - -_-- <br /> 112.7(a)(3)(i) No or incomplete listing of type of oil and storage capacity of containers <br /> 112.7(a)(3)(h) No or inadequate description of discharge prevention measures <br /> 112-7(a)(3)(iii) No or inadequate description of drainage controls <br /> 112.7(a)(3)(iv) Notinadequate description of countermeasures for discharge discovery,response,cleanup <br /> 112.7(a)(3)(v) No or inadequate description of disposal methods for recovered materials <br /> 112.7(a)(3)(vi) No inoomple contact list&phone numbers for response&reporting discharges <br /> 112.7(a)(4) No or inadequate procedures for reporting discharges <br /> 112.7(x)(5) No or inadequate procedures for use in an emergency <br /> 112.7(b)or Plan has inadequate or no prediction of <br /> 112.6(a)(3)(i) equipment failure which could result in discharges <br /> 112.7(c) No adequate oontainment and/or diversionary strictures to prevent a discharge3�1,a 1 r <br /> 112.7(d) No or inadequate demonstration that secondary containment is impracticable <br /> 112.7(d) No periodic integrity and leak testing of containers,valves and piping when impracticability <br /> is claimed for bulk storage containers <br /> 112.7(d)(1) No or inadequate:contingency plan per 40 CFR part 109 or FRP under 112.20 <br /> 112.7(d)(2) No written commitment of manpower,equipment,and materials <br /> 112.7(e) Inspections and tests not in accordance with written procedures in Plan <br /> 112.7(e) Record of inspections are not signed by facility supervisor <br /> 112.7(e) Record of inspections are not maintained for three years <br /> 112.7(0(1) No training of oil-handling personnel on discharge prevention <br /> 112.70(2) No designated person responsible for soil prevention <br /> 112.7(0(3) Spill prevention briefings are not conducted at least annually �(°) itF? C'C x <br /> 112.7(g) No or inadequate description of facility security <br /> 112.7(h)(1) Loadinq/unloading rack drainage does not flow to containment <br /> 112.7(h)(1) Containment system does not hold at least the maximum capacity of the largest single <br /> compartment of any tank car or tank tnxdk using the rack <br /> 112.7(h)(2) No interlocked warning light,physical barrier system,or warning signs to prevent vehicular <br /> departure before complete disconnect from transfer lines <br /> Deficiencies found during the inspection are marked with an"X" <br />
The URL can be used to link to this page
Your browser does not support the video tag.