Laserfiche WebLink
04/02/2001 Du Pont Page 2 of 4 <br /> Product Usage Data Sheet - 3600S <br /> Surface Preparation: <br /> For application over a properly prepared basecoat repair; <br /> ■ Fully mask the vehicle to prevent overspray from sticking. <br /> ■ Allow basecoat to dry thoroughly. <br /> ■ Tack with appropriate basecoat tack cloth prior to applying clear. <br /> Gun Setups: <br /> Conventional <br /> Siphon Feed: 1.5 mm - 1.7 mm ( .059" - .067") <br /> Gravity Feed: 1.3 mm - 1.5 mm ( .051" - .059") <br /> HVLP <br /> Siphon Feed: 1.7 mm - 1.9 mm ( .067" - .075") <br /> Gravity Feed: 1.3 mm - 1.5 mm ( .051" - .059") <br /> Air Pressure: <br /> Conventional <br /> Siphon Feed: 50 - 60 psi @ the gun. <br /> Gravity Feed: 45 - 55 psi @ the gun. <br /> HVLP: 10 psi @ the gun cap. <br /> Application: <br /> Apply a medium first coat. <br /> Flash 10 minutes. <br /> Apply a second wet coat. <br /> Flash/Dry Times: <br /> Air Dry* <br /> Flash between Coats: 10 minutes. <br /> Dust Free: 40 minutes. <br /> Time to Handle (Assemble) : 6 - 8 hours. <br /> Time to Polish: Overnight. <br /> Time to Stripe: Overnight. <br /> Time to Deliver: Overnight. <br /> Express Dry* <br /> Flash before Express Dry: 10 minutes. <br /> Dry Cycle: 10 15 minutes @ 140°F. <br /> Cool Down: 5 10 minutes. <br /> Dust Free: After cool down. <br /> Time to Handle (Assemble) : 4 - 6 hours. <br /> Time to Polish: Overnight. <br /> Time to Stripe: Overnight. <br /> Time to Deliver: Overnight. <br /> Force Dry* <br /> Flash before Force Dry: 10 minutes. <br /> Cycle Time: 30 minutes @ 140°F. <br /> Dust Free: At cool down. <br /> Time to Handle (Assemble) . 2 hours. <br /> Time to Polish: 4 - 6 hours. <br /> Time to Stripe: 4 - 6 hours. <br /> Time to Deliver: 4 - 6 hours. <br /> * To speed up through cure, use 3895 at a rate of 1/2 - 1 ounce per <br /> ready-to-spray quart. <br />