My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
400
>
2200 - Hazardous Waste Program
>
PR0516797
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 2:51:42 PM
Creation date
10/17/2018 3:16:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO PRE 2015
FileName_PostFix
PRE 2015
RECORD_ID
PR0516797
PE
2220
FACILITY_ID
FA0012811
FACILITY_NAME
J & D AUTO BODY INC
STREET_NUMBER
400
Direction
N
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04908064
CURRENT_STATUS
02
SITE_LOCATION
400 N CLUFF AVE A
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/02/2001 D11 Pont Page 3 of 5 <br /> Product Usage Data Sheet - 12375S <br /> Conventional 35 - 45 psi @ the gun <br /> HVLP 6 10 psi @ the gun cap <br /> 3.5 VOC <br /> HVLP 8 10 lbs @ the air cap <br /> Application <br /> Apply 2 medium-wet coats. <br /> Flash / Dry Times <br /> Force Dry <br /> Flash between coats: 3 - 7 minutes <br /> Flash before Force Dry: 0 minutes <br /> Cycle Time: *5 minutes @ 140°F metal temperature <br /> Time to Handle (Assemble) : when cooling <br /> Time to Polish: after a 10 minute cool <br /> Time to Stripe: after a 10 minute cool <br /> Time to Deliver: when cool <br /> Time to Decal : 24 - 48 hours <br /> *Most spraybooths will achieve 5 minutes @ 140°F metal temperature if set <br /> for a 15-20 minute force dry at 180°F. Some booths are equipped with high <br /> temperature lockouts. Consult your manufacturer for booth capabilities, <br /> maximum temperature settings, and sprinkler system activation temperatures. <br /> *Examples for proper bake cycles: <br /> Bake Cycle Temp(°F) <br /> 30 140 <br /> 25 150 <br /> 20 160 <br /> 15 180 <br /> 13 199 <br /> Air Dry Air Dry Air Dry (with V-389S) <br /> Flash between coats: 3 - 7 minutes 3 - 7 minutes <br /> Dust Free: 10 - 15 minutes 10-15 minutes (4.2 VOC) <br /> 45 minutes 35 minutes (3.5 VOC) <br /> Time to Handle (Assemble) : 4 - 6 hours 4 -6 hours <br /> Time to Polish: 4 - 6 hours 4 hours <br /> Time to Stripe: 4 - 6 hours 4 - 6 hours <br /> Time to Delivery: 4 - 6 hours 4 - 6 hours <br /> Time to Decal : 48 - 72 hours 48 - 72 hours <br /> Blending <br /> Panel repair is the approved procedure for clearcoat warranty repairs. This <br /> allows the refinisher to attain the recommended film builds. If the refinisher <br /> chooses to blend, use 19301S ChromaSystemTM Blender. <br /> - Carefully taper the second coat of clear beyond the first <br /> - After the final coat of clearcoat, step-out the coating by mixing 1 part <br /> 19301S Blender to 1 part of the remaining clearcoat and taper the blend with <br />
The URL can be used to link to this page
Your browser does not support the video tag.