Laserfiche WebLink
San Joaquin County AMENDED <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 ..�.1 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www,s4gov.org/ehd <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />CHEROKEE FREIGHT LINES <br />Facility Address: <br />5463 E CHEROKEE RD, STOCKTON <br />Date: <br />January 13, 2017 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS ll, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />201 <br />CFR 112.3(d) Failure to have a licensed PE properly review and certify the SPCC plan. <br />The Professional Engineer (PE) certification is incomplete and conditional. The PE certification did not state that he <br />or his agent "visited" the facility. The SPCC Plan included a section for "Required Improvements," including upgrades <br />to secondary containment, many of these items have not been implemented by the facility, and none of them have <br />been certified by a professional engineer. The PE certification must include all of the aspects in 40 CFR 112.3(d) <br />(1), including attesting that the PE is familiar with 40 CFR Part 112, he or his agent has visited and examined the <br />facility, the Spill Prevention, Control, and Countermeasure (SPCC) Plan has been prepared in accordance with good <br />engineering practice, including consideration of applicable industry standards, procedures have been established for <br />required inspections and testing, and the Plan is adequate for the facility. Immediately obtain a complete PE <br />certification for the facility's SPCC Plan. Submit a copy of the updated SPCC plan with a completed certification to <br />the EHD. <br />This is a repeat violation, Class II. <br />301 <br />CFR 112.5(a) Failed to amend Plan as necessary. <br />A 500 gallon used oil tank was installed on the facility in October 2012 . The previous used oil tank has been <br />"permanently closed." The Spill Prevention, Control, and Countermeasure (SPCC) Plan must be amended when there <br />is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a <br />discharge, within 6 months of the change, and implemented as soon as possible, not later than 6 months following <br />preparation of the amendment. Immediately make all necessary amendments to the SPCC Plan to accurately <br />represent the procedures and policies currently in place at the facility. <br />This is a minor violation. <br />302 <br />CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan was last reviewed on October16, 2011 . A review <br />and evaluation of the SPCC Plan must be conducted at least once every 5 years. You must document your <br />completion of the review and evaluation, and must sign a statement as to whether you will amend the Plan, either at <br />the beginning or end of the Plan, or in a log or appendix to the Plan. The following words will suffice: <br />1 have completed the review and evaluation of the SPCC Plan for (name of facility) on (date), and will (will not) <br />amend the Plan as a result." As a result of this review and evaluation, the SPCC Plan must be amended within 6 <br />months of review, and recertified by a Professional Engineer if any technical amendments were made. Immediately <br />conduct a review of the facility SPCC Plan and make any necessary amendments. <br />This is a repeat violation, Class II. <br />Page 4 of 9 <br />