My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />CAUTION <br />This pipe may carry hazardous material and/or operate at a <br />hazardous pressure level; therefore, it is imperative the instruc- <br />tions in this manual are followed to avoid serious personal in- <br />jury or property damage. In any event, improper installation <br />can cause injury or damage. Installers should read and follow <br />all cautions and warnings on adhesive kits, heat packs, etc. to <br />avoid personal injury. Also, observe general safety practices <br />with all saws, tools, etc. to avoid personal injury. Wear protec- <br />tive clothing when necessary. <br />Make sure work surfaces are clean and stable and that work <br />areas are properly ventilated. <br />INSTALLATION TRAINING SEMINARS <br />Although any requirement for installation training is the re- <br />sponsibility of the regulatory authority, specifier, or end user, <br />NOV Fiber Glass Systems recommends anyone directly in- <br />volved in underground piping installations attend our installa- <br />tion training seminar. <br />In-depth training seminars cover both primary and second- <br />ary containment product installation procedures. The training <br />seminar involves hands-on participation, and each attendee <br />receives installation manuals used during the seminar. A writ- <br />ten, open book test, is given and a passing grade must be <br />achieved. Each installer attending the seminar and passing <br />the test receives documentary proof of attendance which ex- <br />pires after three years. Contact your local distributor or repre- <br />sentative for information on these seminars. <br />To assist installers with proper installation of fiberglass piping <br />systems, the FGS Installation Checklist for Underground Pe- <br />troleum Pipe is available and is included in the Fuel Handling <br />Catalog, accompanying each bundle of pipe. For a copy of <br />this checklist, contact your local distributor or representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.