My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JkI1 17 2017 <br />ENVIRONMENTAL HEALTH <br />GCPARTMENT <br />TABLE OF CONTENTS <br />ReadThis First .......................................... ................................ i <br />Introduction.............................................................................i <br />i <br />Installation Training Seminars.................................................w <br />Piping System Information <br />PipeProducts...........................................................................1 <br />Storage and Handling..............................................................2 <br />PART ONE <br />Installation Instructions for <br />Red Thread IIA and Dualoy 3000/1- Pipe <br />JoiningSystems.......................................................................8 <br />Layout and Preparation...........................................................9 <br />Cutting & Tapering Pipe.........................................................10 <br />Trenching & Backfilling...........................................................13 <br />JointPrep...............................................................................17 <br />Adhesives...............................................................................18 <br />Adhesive Mixing......................................................................18 <br />Adhesive Working Life............................................................19 <br />Joint Assembly: <br />Bell x Spigot Joints.................................................................24 <br />T.A.B. Joints............................................................................26 <br />Heat Assist Methods...............................................................27 <br />Threaded Adapters and ReducerBushings .............................29 <br />Potential Causes of Joint Failure...........................................30 <br />Testing.....................................................................................32 <br />Repair Procedures..................................................................34 <br />PART TWO <br />Installation Instructions for Red Thread IIA and <br />Dualoy 3000/1- Secondary Containment Piping <br />General Concepts...................................................................41 <br />Layout and Preparation........................................................43 <br />Sump Connections................................................................47 <br />JointPrep...............................................................................51 <br />Adhesives...............................................................................52 <br />JointAssembly........................................................................53 <br />Testing Recommendations.....................................................54 <br />Repair Procedures.................................................................56 <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.