My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Before beginning an installation, review the NOV Installation <br />Checklist with the crew and fill out as the job progresses. A <br />completed copy should be retained to document compliance <br />with current State/Federal regulations. Installation checklists <br />are available from your distributor or representative. <br />Following are general guidelines that apply to most piping <br />installations: <br />• For most average -size service stations, the minimum <br />recommended crew size is two. The crew size may be <br />increased as the pipe diameter increase or when install- <br />ing secondary containment piping. <br />• Organize the crew so the adhesive is spread on the <br />bonding surfaces as quickly as possible after mixing the <br />adhesive, particularly in extremely hot weather. <br />• Plan adhesive kit usage so that sufficient kits are avail- <br />able in the area where the bonding will take place. <br />• Plan ahead so a sufficient number of bonds are available <br />to use one whole adhesive kit before the kit is mixed. <br />CUTTING AND TAPERING PIPE <br />Cutting <br />Cut pipe with one of the tools mentioned in equipment list, <br />When cutting, protect pipe from chain vise damage by plac- <br />ing rubber sections or sleeves (180° sections of pipe cut from <br />the same size pipe being tapered) between the pipe and the <br />chain vise. <br />t <br />Scribe Line <br />32 Teeth <br />Perinch <br />Blade <br />1 <br />Abrasive <br />Blade <br />10 <br />Ji.I J i a 'L6,"I <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.