Laserfiche WebLink
Before beginning an installation, review the NOV Installation <br />Checklist with the crew and fill out as the job progresses. A <br />completed copy should be retained to document compliance <br />with current State/Federal regulations. Installation checklists <br />are available from your distributor or representative. <br />Following are general guidelines that apply to most piping <br />installations: <br />• For most average -size service stations, the minimum <br />recommended crew size is two. The crew size may be <br />increased as the pipe diameter increase or when install- <br />ing secondary containment piping. <br />• Organize the crew so the adhesive is spread on the <br />bonding surfaces as quickly as possible after mixing the <br />adhesive, particularly in extremely hot weather. <br />• Plan adhesive kit usage so that sufficient kits are avail- <br />able in the area where the bonding will take place. <br />• Plan ahead so a sufficient number of bonds are available <br />to use one whole adhesive kit before the kit is mixed. <br />CUTTING AND TAPERING PIPE <br />Cutting <br />Cut pipe with one of the tools mentioned in equipment list, <br />When cutting, protect pipe from chain vise damage by plac- <br />ing rubber sections or sleeves (180° sections of pipe cut from <br />the same size pipe being tapered) between the pipe and the <br />chain vise. <br />t <br />Scribe Line <br />32 Teeth <br />Perinch <br />Blade <br />1 <br />Abrasive <br />Blade <br />10 <br />Ji.I J i a 'L6,"I <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />