My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGFEIVED <br />JA I� 17 2017 <br />ENVIRONMENTAL HEALTH <br />CEPARTMENT <br />Flange Section or Joint Leak Repairs Using 8088 <br />Repair Kit (Overwrapping Entire Fitting) <br />1. Take pressure off the system and dry the area around the <br />leak. <br />2. Grind or cut flange sections off the clamshell secondary <br />containment fitting and sand flush with the fitting body. <br />3. If needed, mix adhesive with filler to grout in any gaps <br />or voids in the bond line or to create a smooth wrapping <br />surface. <br />4. Per instructions in the 8088 repair kit, apply adhesive to <br />the sanded area. Wet out glass and wrap around the fit- <br />ting as though it were a section of pipe, centering the first <br />layer over the joint and extending 2" (50 mm) past the <br />end of the fitting onto the pipe. Apply tension to squeeze <br />adhesive through the glass layer. For elbows and tee, slits <br />may have to be cut in the center section for glass to lie <br />flat. <br />5. Repeat previous step on the center of the joint and then <br />the other side of the fitting extending 2" (50 mm) over the <br />end of the fitting. When starting the glass, overlap the first <br />wrap a minimum of 2" (50 mm). <br />6. Repeat two previous steps until three layers of glass have <br />been placed over the fitting. <br />7. Cure per the time listed in the adhesive kit instructions. <br />Repairing Extensive Pipe Damage to <br />Red Thread IIA and Dualoy Fittings <br />When damage is less than 2" (50 mm) long but more than <br />2" (50 mm) around the circumference of the pipe, the follow- <br />ing repair procedures should be followed. If the pipe is buried, <br />excavate a working area large enough to allow for repairs to <br />be made. Use a secondary containment sleeve coupling to <br />make this type repair. Containment sleeve couplings are 14" <br />(350 mm) long. <br />Caution: When cutting out extensive damage in the contain- <br />ment pipe (only), be extremely careful not to damage the inter- <br />nal product piping. <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.