My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />12. SECONDARY PIPE TESTING <br />RECEIVED <br />DEC jage,,of <br />Test Method Developed By: X Piping Manufacturer _ Industry Standard ,N Jih6rHEALI <br />❑ Other (Sped) DEPARTMENT <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1110-15 Psi <br />PROW <br />Piping Run #5 <br />Piping Run #6 <br />Piping Run # 7 <br />Piping Run # 8 <br />Piping Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: 4" <br />4" <br />3" <br />3" <br />Length of Piping Run: Approx. 12' <br />Approx. 12' <br />Approx. 270' <br />Approx. 30' <br />Product Stored: Diesel Siphon <br />Diesel Manifold <br />Diesel auto island <br />Regular Siphon <br />Method and location of Test boot at STP #1 & <br />piping -run isolation: STP #2 <br />Test boot at STP #1 & <br />STP #2 <br />Test boot at STP #2 <br />& UDC's 17,18,19,& 20 <br />Test boot at STP #3 & <br />Piping Sump #9 <br />Wait time between applying 10 Minutes <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: 10:35 <br />10:45 <br />11:00 <br />11:10 <br />Initial Reading (Ri): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: 11:35 <br />11:45 <br />12:00 <br />12:10 <br />Final Reading (RF): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: 1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): 0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or No Loss in Psi <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.