Laserfiche WebLink
SWRCB, January 2002 <br />12. SECONDARY PIPE TESTING <br />RECEIVED <br />DEC jage,,of <br />Test Method Developed By: X Piping Manufacturer _ Industry Standard ,N Jih6rHEALI <br />❑ Other (Sped) DEPARTMENT <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1110-15 Psi <br />PROW <br />Piping Run #5 <br />Piping Run #6 <br />Piping Run # 7 <br />Piping Run # 8 <br />Piping Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: 4" <br />4" <br />3" <br />3" <br />Length of Piping Run: Approx. 12' <br />Approx. 12' <br />Approx. 270' <br />Approx. 30' <br />Product Stored: Diesel Siphon <br />Diesel Manifold <br />Diesel auto island <br />Regular Siphon <br />Method and location of Test boot at STP #1 & <br />piping -run isolation: STP #2 <br />Test boot at STP #1 & <br />STP #2 <br />Test boot at STP #2 <br />& UDC's 17,18,19,& 20 <br />Test boot at STP #3 & <br />Piping Sump #9 <br />Wait time between applying 10 Minutes <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: 10:35 <br />10:45 <br />11:00 <br />11:10 <br />Initial Reading (Ri): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: 11:35 <br />11:45 <br />12:00 <br />12:10 <br />Final Reading (RF): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: 1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): 0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or No Loss in Psi <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />