Laserfiche WebLink
DEC 292016 <br />SWRCB, January 2002 Page of <br />13_ SFCONDARV PTPF TF.STTNG <br />Test Method Developed By: ❑ Piping Manufacturer Industry Standard -- Profbb* ft' eNT <br />Ll Other (Spec) res 99 IIVV''C <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Equipment Resolution: <br />Piping Run#9-21-5 <br />Piping Run#10-22-S <br />Piping 11un#11-23-5 <br />Piping Run#12-24-S <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 18' <br />Approx. 18' <br />Approx. 18' <br />Approx. 18' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at <br />UDC #21-M <br />Test boot at <br />UDC #22-M <br />Test boot at <br />UDC 923-M <br />Test boot at <br />UDC #24-M <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />8:10 <br />8:20 <br />8:30 <br />8:40 <br />Initial Reading (RI): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time.. <br />9:10 <br />9:20 <br />9:30 <br />9:40 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up, for failed tests) <br />*M=Master <br />*S=Satellite <br />