My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />14. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer (; Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15Psi <br />*Equipment <br />al: <br />13-25-S <br />Fiberglass <br />Piping Run#14-26-S Piping Run#15-27-S <br />Fiberglass Fiberglass <br />Piping Run # <br />Piping Manufacturer: <br />Smith <br />Smith Smith <br />Piping Diameter: <br />3" <br />3" 3" <br />Length of Piping Run: <br />18' <br />18' 18' <br />DEC 2 9 2016 <br />Product Stored: <br />Diesel <br />Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at <br />UDC #25-M <br />Test boot at Test boot at ENVIR <br />UDC #26-M UDC #27-M <br />DNMENTAL HEA <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes 10 Minutes <br />Test Start Time: <br />8:50 <br />9:00 9:10 <br />Initial Reading (Ri): <br />5 Psi <br />5 Psi 5 Psi <br />Test End Time: <br />9:50 <br />10:00 10:10 <br />Final Reading (RF): <br />5 Psi <br />5 Psi 5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour I Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi 0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi No Loss in Psi <br />Test Result: <br />Pass <br />Pass Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />M=Master <br />S=Satellite <br />,H <br />
The URL can be used to link to this page
Your browser does not support the video tag.