Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING$UMP TR T�*-- <br /> IVEI <br /> Test Method Developed By: n Sump Manufacturer i~,Industry S"1 0 01�Professional Bngineer <br /> ❑Other(Spee(6) <br /> Test Method Used: ❑Pressure 2 va2NVlR V N n N p <br /> A E ,�,,�ostatic <br /> 11Other(Sped) ne�an , i ( <br /> Test Equipment Used: <br /> r-h IT <br /> Equipnreut Resolution: <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration, <br /> Height from Tank Top to Lowest <br /> Electrical Penetration, <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* <br /> Wait time between applying water <br /> and starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(R£): <br /> Test Duration.: <br /> Change in Reading(RtrR): <br /> Pass/Fail Threshold or Crituia: <br /> Was sensor removed for testing? <br /> Was wusor properly replaced and <br /> verified functional after testing? <br /> COTRakents—(include information on repairs►Wade ptior to testing, and rec ommended,follow up farfailed tests) <br /> Piping Sumps nut tested with this testing event <br /> 1 If the entire depth of the sump.is not tested,specify how much was tested, If the answer to M of the questions indicated with an <br /> asterisk(*)is`NO"or"NA",the entire sump must be tested. (See SWRCR LG-160) <br />