My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:15:30 AM
Creation date
10/19/2018 3:11:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2014 - 2015
FileName_PostFix
2014 - 2015
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/10/2015 11:56 5308248776 LOVES PAGE 16/12 <br /> G`F. V EU <br /> S WRCB,January 2002 SEP 1 Q 2015 Pageof y <br /> 7. UNDER-DISPENSER CQNTAINMI✓NT C TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry 9FOW 0 NK��1�n� <br /> 0 Other(Specj&) "`=Airy rfc)sRTeAFN ` I <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC#17&18 UDC# UDC# UDC# <br /> UDC Manufacturer. Environ <br /> UDC Material: 7 Poly Plastic <br /> UDC Depth: 30" <br /> Height from UDC Bottom to Top 10" <br /> of Hi hest Piping Penetration: <br /> Height from UDC Bottom to g~ <br /> Lowest Electrical Penetration: <br /> Condition.of UDC prior to Dry <br /> - <br /> Portion of UDC Tested Water Line 15" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No <br /> roduct and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail- <br /> safe shutdown?* No <br /> Was fail-safe verified to be N/A <br /> o ational?* <br /> Wait time between applying 5 Minutes <br /> water and starting test <br /> Test Start Time: 2;05 <br /> Initial Read (RT): .001 <br /> Test End Time: 2:35 <br /> Final Reading(Ry;): .001. <br /> Test Duration: 30 Minutes <br /> Char► a in Reading - 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> Was sensor removed for testin. ? I Yes <br /> Was sensor properly replaced and <br /> verified functional after tasting? Yes <br /> Commexlts—enc&+de in otmation on re airs made ptior to tesfing,and recommendedfolto►v-r or ailed tests) <br /> Ifthe entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.