My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:15:30 AM
Creation date
10/19/2018 3:11:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2014 - 2015
FileName_PostFix
2014 - 2015
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 2 8 2014 <br />SWRCB, January 2002 ENVIR( ,/[N- .NRALTH <br />4 CPTT.TJ(lVF.7214TT,T. C ONTATNIV,NT BOXES DEPAR1AA1=11J r <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/OvcrJill Containment Boxes are Present, but were Not Tested ❑ _ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard Q Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ vacuum ® Hydrostatic <br />❑ Other (Sped) _ <br />Test Hquipment Used: TS -STS icon sump test system <br />Equipment Resolution <br />- _ <br />,,. <br />t <br />.. ,..; - <br />Spill Box l! <br />�k �,4ba env � ._. � <br />Spill Box If <br />6+ � 3, vM i' <br />Spill Box ti <br />.i��✓r. <br />. , s� L �—LL <br />Spill Boz N <br />Bucket Diametel-: <br />_— <br />Bucket Depth: <br />_ <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 min <br />15 min <br />15 min <br />15 min <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF -R,): <br />-d <br />Pass/Fail Threshold or <br />Criteria:-- <br />.002 <br />002 <br />.002 <br />.002 <br />TestBesuit: <br />❑ Pass ❑ hall <br />❑ Pass ❑ FH1I <br />❑ pass Fl Fail <br />❑ Pass I � Fait <br />Comments — (inchide information on repairs made prior to testing, and reconimeiiclecl follois-iip for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.