My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:15:30 AM
Creation date
10/19/2018 3:11:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2014 - 2015
FileName_PostFix
2014 - 2015
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F) BRAVO ELECTRICAL OFFSET FRAME <br />INSTALLATION INSTRUCTIONS <br />Make sure all electrical conduits and piping are clear of <br />any equipment or other obstructions in the dispenser. <br />Physically check your hydraulic cabinet for obstructions before any installation begins. <br />BRAVO UNDER DISPENSER CONTAINMENT ELECTRICAL OFFSET INSTRUCTIONS <br />F.1 ) The Frame should be fully installed and sealed with Vulkem before conduit installation. <br />F.2) Make sure all electrical conduits (piping) are clear of any equipment in the dispenser. <br />Physically check your hydraulic cabinet for obstructions before any installation begins. <br />F.3) Conduits must be run and tightly secured to the sump. <br />FA) Pour concrete around outside of Dispenser Sump per Bravo Installation Instructions. <br />Special Instructions: Sloped <br />Electrical Area <br />F.5) F.J) You must Slope concrete within <br />the Electrical Offset opening between the <br />steel frame walls. This area MUST be <br />sloped and MUST be sealed at the areas'° Steel <br />shown below. �- q. Lip <br />4 <br />. 'S <br />L 4 r, <br />' 4 <br />Concrete Island <'4 <br />Sump <br />w Interior <br />Special Instructions: <br />Sealed <br />F.6) You must seal where concrete or <br />Areas <br />conduit meets steel, as shown. Seal the <br />downside of the slope and the conduit Q 'a <br />area with Vulkem 116. p <br />° 4 . <br />Sump <br />Interior <br />. L. �. a �: a•4 .. a <br />7 <br />ii -B7000 -SP -13A <br />
The URL can be used to link to this page
Your browser does not support the video tag.