Laserfiche WebLink
i <br />FOR WAYNE-VAC ELECTRICAL OFFSET <br />Mark the medallions you need to penetrate with conduit and use a centralized hole saw centered <br />in the middle of the raised medallion to cut the ones you need. Only use a hole saw that matches <br />your conduit size and hand sand the hole edge if the conduit does not cleanly fit through. After <br />target elevation, seal -offs and other conduit components have been installed, seal the open edge <br />with Vulkem 116 polyurethane sealant. This sealant comes in a standard size caulk tube and is <br />provided by Bravo with your sump. <br />C <br />8 ii -B7000 -SP -13A <br />