Laserfiche WebLink
Love's Country Store of California #223, 1553 Colony Rd, Ripon, CA 95366 SR0069236 <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />4. Secondary containment testing for the under dispenser containment and the product <br />piping is required six months after installation. Provide 48 hours notification to the EHD <br />when this test is scheduled. <br />5. Soil sampling analytical results must be received directly from the analytical laboratory <br />within 30 days of the UDC removal. <br />6. The piping rinsate hazardous waste manifest must be received by this department <br />before this permit can be completed. <br />7. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />b. A valid, current California UST Service Technician certificate issued by the <br />International Code Council (ICC), and <br />c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being tested, repaired, or serviced. <br />8. Qualified installers must possess or work under the direct and personal supervision of an <br />individual physically present at the work site who possesses all of the following: <br />a. A valid, current contractor's license issued by the Contractors State License Board, <br />and <br />b. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being installed, and <br />c. A valid, current UST Installation/Retrofitting certificate issued by the International <br />Code Council (ICC). <br />9. Log into the California Environmental Reporting System (CERS), complete and submit a <br />"UST Certification of Installation/Modification" form for the under dispenser <br />containments and the product piping installed. <br />10. All components must be certified by an independent testing organization and labeled as <br />required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br />Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br />11. Permit expires 180 days from the date of approval. If an extension to the expiration date <br />is required, a written request must be submitted to this office prior to the expiration date. <br />2 <br />