Laserfiche WebLink
Garrett Backus [EH] <br />From: Keith <keith@perkspetroleum.com> <br />Sent: Thursday, April 24, 2014 2:51 PM <br />To: Garrett Backus [EH] <br />Subject: RE: Loves - Ripon <br />Garrett, <br />Item # 1. Yes the secondary lines will slope towards UDC's and the secondary containment will be open <br />allowing any product to flow free to the UDC's. <br />Item # 2. If the existing pea gravel is good and clean from any contaminants it will be reuse. If additional backfill <br />material is needed pea gravel is the only material we will use. <br />If you have any other questions that are needed to be answered please let me know. <br />Thanks, <br />Keith Perks <br />keith(d)perkspetroleum. com <br />Sparks office <br />765 E. Greg st. suite 103 <br />Sparks, NV 89431 <br />775-358-4403 office <br />775-358-4411 fax <br />Elko office <br />1250 Lamoille Hwy suite 627 <br />Elko, NV 89801 <br />775-777-8711 <br />www.perkspetroleum.com <br />From: Garrett Backus [EH] [mailto:gbackus@sjcehd.com] <br />Sent: Thursday, April 24, 2014 2:21 PM <br />To: keith@perkspetroleum.com <br />Subject: Loves - Ripon <br />Hi Keith, <br />Keith, <br />I'm about to mail out your permit with the approval letter but I need some clarification by email: <br />1 <br />