My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:15:30 AM
Creation date
10/19/2018 3:11:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2014 - 2015
FileName_PostFix
2014 - 2015
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVFP- <br />MA.�,, <br />U 6 2014 <br />8. SECONDARY PIPE TESTING <br />"fest Method Developed By: X Piping Manufacturer - Industry Standard ❑ ry 14 <br />❑ Other (Spec) TMENT <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br />.,__ . �, Piping Run #1 <br />Piping Run #2 Piping Run # 3 Piping Run # 4 <br />Piping Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: 4" <br />4" <br />3" <br />3" <br />Length of Piping Run: Approx. 250' <br />Approx. 320' <br />Approx. 350' <br />Approx.350' <br />Product Stored: Diesel <br />Diesel <br />Regular 87 <br />Super 91 <br />Method and location of Test boot at STP # 1 & <br />piping -run isolation: UDC's 21 m thru 24m <br />Test boot at STP #2 & <br />UDC's 25m thru 27s <br />Test boot at STP #3& <br />UDC's at auto island <br />Test boot at STP #4& <br />UDC's at auto island <br />Wait time between applying 10 Minutes <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: 1:50 <br />2:00 <br />1:30 <br />1:35 <br />Initial Reading (R,): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: 2:50 <br />3:00 <br />2:30 <br />2:35 <br />Final Reading (RF): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: 1 Hour <br />1 Hour <br />I Hour <br />I Hour <br />Change in Reading (RF -R,): 0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or No Loss in Psi <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.